Wastewater System SCADA Replacement Project
Closed State & local contract opportunity Posted
- Solicitation number
- BD-24-1654-ACCTP-ACCTP-127073
- State
- Massachusetts
- Responses due
Opportunity facts
- UNSPSC code
- Point of contact
-
- Steven Williams swilliams@belchertown.org (413) 323-0410
Opportunity details come from commbuys.com. Updated .
About this opportunity
The Commonwealth of Massachusetts is procuring comprehensive upgrades to its wastewater treatment system's supervisory control and data acquisition (SCADA) infrastructure. The project encompasses multiple components including installation of new telemetry equipment, control panels, and enclosures at the primary wastewater treatment plant, as well as upgrades to existing programmable logic controllers (PLCs) and the disk filter panel at the same facility. Additionally, the procurement includes PLC replacements at four remote pump stations that are part of the broader wastewater system network. The request for proposals was posted on March 25, 2026, with a submission deadline of April 23, 2026, providing potential bidders approximately one month to prepare and submit their proposals. While specific evaluation criteria, qualifications requirements, and detailed project specifications are not enumerated in the available information, bidders should anticipate standard industry requirements for SCADA system integration, PLC programming expertise, and wastewater treatment facility experience.
The contract opportunity documentation does not specify set-aside designations, restrictions on respondent eligibility, or disadvantaged enterprise requirements at this time. No incumbent vendors, current contractors, or existing technology integration requirements have been identified in the available materials. Similarly, the notice does not disclose a specific budget range or estimated award value for this SCADA replacement initiative. Interested parties should obtain the complete solicitation documents and bid specifications from the Commonwealth of Massachusetts to determine eligibility requirements, bonding obligations, insurance requirements, and any other compliance factors necessary for submission. Organizations interested in bidding should monitor the posting source for any amendments, addenda, or clarifications issued prior to the April 23, 2026 deadline.
Opportunity text
The work consists of upgrades to the SCADA system including new telemetry equipment, panels, and enclosures at the wastewater treatment plant, upgrades to the existing programmable logic controllers (PLCs) and disk filter panel at the wastewater treatment plant, and PLC replacements at four remote pump stations.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity