Ward 1 - 2025 Infrastructure Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66850-NONST-2025-000000012
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72121505 Waste water and sewage treatment plant construction service
- 95121810 Irrigation and flood control waterworks
- 95121811 Aquaduct or other water supply conduit, except pipeline
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- Point of contact
-
- Patricia Rice price@cartersloope.com (706) 769-4119
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Cornelia, Georgia, operating within Hall County, is soliciting sealed bids for the Ward 1 - 2025 Infrastructure Improvements project through a single-award construction contract. The scope of work encompasses the installation of approximately 4,000 linear feet of 8-inch sanitary sewer main, 5,400 linear feet of 6-inch and 2-inch water main, and 300 linear feet of corrugated plastic pipe storm pipe, along with all associated components including fire hydrants, valves, manholes, storm structures, pavement replacement, earthwork, grassing, and soil erosion and sedimentation control measures. Bids must be submitted electronically through QuestCDN.com no later than October 23, 2025 at 2:00 PM local time, with base costs posted within approximately 30 minutes of the bid closing deadline. Successful contractors must hold a valid Georgia State "Utility Contractor" license and employ a certified "Utility Manager" for utility work oversight. Required bonds include a bid bond or certified cashier's check equal to at least 10 percent of the base bid, with performance and payment bonds each equal to 100 percent of the contract price, all issued by a Georgia-licensed surety company with an "A" minimum rating and financial strength of at least five times the contract price. The project completion period is 180 consecutive calendar days, and digital specifications and contract documents are available at www.cartersloope.com/outforbid for a $100 download fee, with an additional $50.00 bid submittal fee required.
Contractors and subcontractors must comply with the Georgia Security and Immigration Compliance Act by registering with the E-Verify program; no set-aside designations for disadvantaged enterprises are specified in the procurement documents. The City of Cornelia will obtain all easements and rights-of-way for permanent installations prior to issuance of the Notice to Proceed, while the contractor is responsible for submitting the NPDES Stormwater Permit. The project is funded by the City of Cornelia, though no specific budget range or award value is disclosed in the available documentation. Bids may not be withdrawn for 60 days after the bid closing time, and no paper bid submissions will be accepted. No incumbent vendors or current contractors are referenced in the procurement materials, and no existing infrastructure integration requirements beyond compliance with the specified plans and specifications are indicated.
Opportunity text
Sealed bids for construction of the Ward 1 - 2025 Infrastructure Improvements will be received until the closing time of October 23, 2025 at 2:00 PM local time. Bids must be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State law. Base Cost of all Bids will be posted by the Owner/Engineer to the QuestCDN website within approximately 30 minutes after the bid closing time. The work to be completed shall consist of furnishing all labor, material, and equipment to install approximately 4,000 LF of 8" sanitary sewer main, 5,400 LF 6" and 2" water main, and 300 LF CPP storm pipe including, but not limited to fire hydrants, valves, manholes, storm structures, pavement replacement, earthwork, grassing, soil erosion and sedimentation control measures, and appurtenances necessary to provide a complete installation. Time allotted for completion of work is 180 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Complete digital specifications and contract documents are available at www.cartersloope.com/outforbid. Bidders may also view the digital plan documents for free by creating a Quest account and entering the Quest project number 9801930 on the website's project search page. Bidders can download the digital documents for a fee of $100 payable through the website. Bids must be submitted electronically at QuestCDN.com. There will be an additional $50.00 bid submittal fee. Please contact QuestCDN customer support at 952-233-1632 or info@questcdn.com for assistance ...See Additional Information on Supporting Documents Section...
Files
| File | Type | Posted |
|---|---|---|
| 00100_Invitation to Bid.pdf |