The Ohio Department of Natural Resources (ODNR) is seeking a contractor to perform immediate sewer line repair at the Wingfoot Lake State Park's Pinetree Restroom facility in Summit County. The project involves replacing approximately 80 linear feet of existing cast iron plumbing that has exceeded its 50-year lifespan, including new stub-outs to urinals and toilets, which will connect to existing tile lines. The primary objective is to address ongoing facility closures caused by chronic sewer...
The Ohio Department of Natural Resources (DNR) is seeking bids for a sewer line repair project at Wingfoot Lake State Park's Pinetree Restroom facility in Summit County. The procurement involves replacing approximately 80 feet of deteriorated cast iron plumbing, including pipes, stub-outs to urinals and toilets, and connections to existing tile lines. The project aims to resolve ongoing issues of clogging and back-pitched sewer drains that have caused facility closures. The Request for Quotation...
The Ohio Department of Natural Resources (ODNR) Division of Wildlife is soliciting bids for a water control structure replacement and levee repair project at the Big Island Wildlife Area in Marion County, located within Meigs County. The procurement opportunity involves removing an existing corrugated metal water control structure and installing a new 18" Agri-Drain water control structure with a 6' riser, along with comprehensive levee system repairs. Contractors are required to provide...
The Ohio Department of Natural Resources (ODNR) is seeking HVAC service providers for facilities across 11 northern Ohio counties, with a specific focus on Divisions of Parks and Watercraft, Natural Areas and Preserves, Forestry, and Oil and Gas. The contract period will run from July 1, 2025 through June 30, 2027, covering preventative maintenance and repair services for various state facilities. Bidders must agree to service all facilities within a specific county to be awarded the contract,...
The Ohio Department of Natural Resources (ODNR) is seeking a qualified vendor to perform a metal roof installation project at Middle Bass Island State Park, located in Putnam County. The specific scope of work involves installing 2x4 roof purlins over an existing concrete roof, implementing a Gallery 28-gauge Parallel Rib style metal roof system fastened with 1" screws, and installing new flashing boots around vent pipes. The vendor will be responsible for complete project management,...
The Ohio Department of Natural Resources (ODNR) is seeking bids for the installation of a Hydromatic HPS4SCP023243 submersible solids handling pump at Mohican State Park in Loudonville, Ashland County. The procurement specifically requires a 23HP, 460V, 60HZ, 3-phase pump with a 35-foot cord, with no substitutions permitted. The selected vendor will be responsible for supplying all materials, obtaining necessary permits, and completing site clean-up for the lift station pump installation....
The Ohio Department of Natural Resources (ODNR) Division of Wildlife is seeking a contractor to perform levee repair, water control structure removal, and Agri-Drain installment at the Big Island Wildlife Area located in Marion County. The project's primary objectives include restoring wetland habitat and improving water management capabilities for wildlife recreation and conservation. Specific deliverables involve removing an existing water control structure, repairing the levee system, and...

The state of Ohio, specifically the Ohio Department of Natural Resources (DNR) operating in Franklin County, is seeking a qualified contractor to perform a valve replacement project at their headquarters located at 1500 Dublin Road in Columbus. The primary scope of work involves removing and replacing a 6-inch valve in the meter pit, which is currently experiencing a leak of approximately one to two gallons per minute, situated in the northwest parking lot area. The project requires completion by 5 PM on Friday, August 14, 2025, with a mandatory site visit preceding the work. Contractors must be prepared to submit a comprehensive bid demonstrating their ability to efficiently execute the plumbing repair, with the contract to be awarded to the lowest responsive and responsible bidder. Key submission requirements include invoicing through Ohio Shared Services (OSS), with options for email, fax, or mail submission, and all potential bidders must communicate with Jason Gibbs, the Customer Support & Warehouse Manager, for project-specific inquiries.

The procurement opportunity appears to encourage participation from diverse vendors, with previous documentation indicating a preference for Minority Business Enterprises (MBE) and Executive Diversity, Growth and Equity (EDGE) vendors. Contractors must comply with various state regulations, including maintaining a drug-free workplace, adhering to ethics laws, and confirming they are not conducting business with restricted jurisdictions. The contract requires strict geographical compliance, with contractors prohibited from performing services offshore without explicit state approval. While no specific budget range is provided in the documentation, contractors must be prepared to complete the valve replacement within the specified timeframe and submit detailed documentation, including an OPERS Independent Contractor Form. Potential bidders should also be aware of additional compliance requirements outlined in the Standard Terms and Conditions and Addendum to Bid Quote Template, which cover various administrative and operational expectations for state government contractors.