Valve and Actuator Replacement

Awarded State & local contract opportunity Posted

Solicitation number
MDJ-2503
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Cobb County-Marietta Water Authority is requesting sealed bids for manufacture and installation of butterfly valves and associated services for the James E. Quarles Water Treatment Plant, with bids due March 22, 2022 at 11:00 a.m. and a mandatory pre-bid conference on March 8, 2022 at 10:30 a.m. at the treatment plant. Only valve manufacturers meeting all contract requirements are eligible to submit.

The scope encompasses manufacture of butterfly valves for eleven existing filters and two backwash rate-of-flow valves (BW-MV-1 and BW-MV-3); mounting of owner-provided electric actuators to the manufactured valves in two phases (Filters 4–11 and BW-MV-1 first, then Filters 1–3 and BW-MV-3); coordination with the actuator manufacturer to ensure correct mounting brackets; testing of each assembled valve-actuator system; and startup services. The awardee must provide FOB Destination shipping for owner-provided actuators from the owner's facility to the manufacturer's facility, and FOB Destination shipping for assembled valves and actuators from the manufacturer's facility back to the owner's facility. The manufacturer assumes all transportation risks and retains title and control of goods until delivery.

Each bid must be accompanied by a bid bond equal to five percent of the total contract amount, a notarized Non-Collusion Affidavit, an Affidavit Verifying Status for the Public Benefit Application, and a Security and Immigration Compliance Act Certification. The successful bidder will furnish a Performance Bond and Payment Bond. All bids remain subject to acceptance for sixty days following bid opening. Questions are due by 4:00 p.m. on March 9, 2022, directed to Frank Rombardo at frombardo@hazenandsawyer.com. The Engineer for the project is Hazen and Sawyer. The Cobb County-Marietta Water Authority reserves the right to reject any or all bids and re-advertise.

Opportunity text

The Pre-purchase Agreement will result in the purchase of butterfly valves and associated services for eleven existing filters and backwash rate-of-flow (ROF) valves (BW-MV-1 and BW-MV-3). The Scope includes, but is not limited to, the following major elements: • Manufacture of valves for Filters 1-11 and Backwash ROF valves (BW-MV-1 and BW-MV-3). • Mounting of all electric actuators provided by the Owner to the valves being furnished. Actuators will be turned over in two phases: i) actuators for Filters 4-11 and BW-MV-1 and ii) actuators for Filters 1-3 and BW-MV-3. • Coordination with the actuator manufacturer to ensure the correct mounting bracket for each valve is utilized. The mounting brackets shall be provided by the valve manufacturer. Valve manufacturer services include testing of each assembled valve and actuator as a system, and startup services. • Provision of shipping, FOB Destination from Owner's facility to Manufacturer's facility for Owner-provided electric actuators. • Provision of shipping, FOB Destination for assembled valves and electric actuators from Manufacturer's facility to Owner's facility. • The Manufacturer shall pay for, and assume risks associated with, transportation of the Goods and retain title and control until the Goods are delivered to the Point of Destination. The Valve Pre-purchase Contract will be awarded as one Contract. Only Bids submitted by valve manufacturers meeting the contract requirements will be considered. See attachment for more details.

Files

File Type Posted
Award Information —
Valve and Actuator Replacement —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity