The Pennsylvania Department of Transportation (PennDOT) is soliciting bids for replacement of the US 62 single-span bridge over Prather Run in Hickory Township, Forest County, with bids due December 3, 2026 at 11:00 a.m. Prequalification is required, and the project is federally funded with federal-aid construction provisions.
The scope covers the single-span structure replacement over Prather Run, roadway reconstruction, guiderail, signing and drainage updates, environmental control, and seeding on State Route 0062, Section B05, from approximately segment 0260 offset 0285 to approximately segment 0260 offset 2750. The bid package includes numerous line items across clearing and grubbing, excavation, asphalt courses and mixtures, bridge removal and new construction, traffic control devices, temporary barriers, and environmental management. Erosion and sediment control and stormwater management certifications apply.
The project cost range is $1 million to $2.5 million. Notice to Proceed is January 19, 2027, with required completion on May 26, 2028. Road user liquidated damages of $2,500 per day apply for each day State Route 62 is not open to traffic in all lanes after October 29, 2027, with temporary traffic signals and barrier walls removed. Construction engineering liquidated damages apply for failure to complete physical work by November 12, 2027, excluding reseeding and erosion and sediment control removal.
The contract carries a 0% DBE goal, Buy America requirements, and prevailing wage rates. Executive Order 11246 equal employment opportunity compliance applies in the Erie, Pennsylvania economic area. The contractor must submit the Worker Protection and Investment Certification Form (BOP-2201) within seven calendar days after bid opening and comply with applicable Pennsylvania labor and workforce safety laws.
Opportunity text
This project is the single span structure replacement over Prather Run including roadway reconstruction, guiderail, signing updates, drainage updates, environmental control, and seeding, as indicated on the approved drawings included in the bid package for State Route 0062, Section B05, in Hickory Township, Forest County from approximately segment 0260 offset 0285 to approximately segment 0260 offset 2750.
Files
| File | Type | Posted |
|---|---|---|
| 853102padot88475.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity