US 30 - Breezewood to Everett Resurfacing
Closed State & local contract opportunity Posted
- Solicitation number
- 116801
- State
- Pennsylvania
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Pennsylvania Department of Transportation is soliciting bids for resurfacing on US 30 (Lincoln Highway) from west of Breezewood to the Juniata River Bridge in East and West Providence Townships and Everett Borough, Bedford County, with bids due May 21, 2026 at 11:00 a.m. at the Commonwealth Keystone Building in Harrisburg. Prequalification is mandatory; no pre-bid meeting is required.
The scope encompasses resurfacing (base, binder, and wearing courses) totaling 327,039 square yards of wearing course asphalt, joint sealing for 83,224 linear feet, concrete pavement work, drainage improvements, guide rail installation, pavement markings, slope repair work along US 30 from Raystown Branch to SR 1011, and highway lighting upgrades to energy-efficient alternatives at the US 30/Bud Shuster Bypass (SR 1007) interchange. The work spans State Route 0030, Sections 045 and 053, approximately Segment 0470 Offset 2654 to Segment 0621 Offset 2512.
The project cost range is $12.5 million to $14.999 million. No Disadvantaged Business Enterprise set-aside requirement is specified. The contract is classified as a Federal Project subject to Buy America provisions and the Build America, Buy America Act, which mandate that iron, steel, manufactured products, and construction materials be produced in the United States. Wage rates apply.
The anticipated Notice to Proceed is July 6, 2026, with required completion by October 22, 2027. Road User Liquidated Damages provisions apply across five construction phases, with daily penalties ranging from $2,824 to $8,185 depending on phase and traffic-flow direction. The contractor must submit a Worker Protection and Investment Certification Form (BOP-2201) within seven calendar days of bid opening, comply with Erosion and Sediment Pollution Control Plan requirements, and obtain necessary permits including coordination with the County Conservation District and Department of Environmental Protection. All materials must be electronically certified through ECMS using DocuSign PDF forms.
Opportunity text
This project is the Resurfacing on US 30 (Lincoln Highway) from the end of the 4-lane west of Breezewood to the Juniata River Bridge in Townships of East and West Providence and Everett Borough, Bedford County. This project also includes highway lighting upgrades to energy efficient alternatives at the US 30/ Bud Shuster Bypass (SR 1007) interchange and slope repair on US 30 from Raystown Branch of the Juniata River to SR 1011 (East Graceville Road) in East Providence Township, Bedford County as indicated on the approved drawings included in the bid package for State Route 0030, Sections 045 and 053 from approximately Segment 0470 Offset 2654 to Segment 0621 Offset 2512.
Files
| File | Type | Posted |
|---|---|---|
| 821584padot116801.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity