Upgrade Deionized Water System, State Public Health Lab
Closed State & local contract opportunity Posted
- Solicitation number
- IFB1-FAAA-2025000180-1
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC codes
- Point of contact
-
- Kristi Gamble kristi.gamble@state.co.us (303) 692-2000
Updated .
About this opportunity
The State of Colorado is seeking a contractor to upgrade the Deionized Water System at the State Public Health Laboratory located in Denver County and Denver City. This procurement opportunity, identified by the contract ID 67de9b9e06526f071c020ce4, was posted on March 21, 2025, with proposals due by April 22, 2025. The primary objective of this contract is to modernize and enhance the existing deionized water system, which is critical for maintaining high-quality laboratory operations and research capabilities. Potential bidders will need to demonstrate technical expertise in water system design, installation, and integration specific to scientific laboratory environments. Comprehensive qualifications should include proven experience with complex water treatment systems, knowledge of public health laboratory standards, and the ability to minimize operational disruptions during system upgrades. While specific evaluation criteria are not explicitly detailed in the provided information, contractors will likely be assessed on their technical capabilities, project implementation approach, cost-effectiveness, and demonstrated understanding of specialized laboratory infrastructure requirements.
The contract does not specify explicit set-aside designations or restrictions on bidding organizations based on the available information. Potential respondents should be prepared to provide detailed technical proposals that outline their approach to upgrading the deionized water system with minimal interruption to laboratory operations. Although specific budget ranges are not disclosed, similar laboratory infrastructure projects typically range from $250,000 to $750,000 depending on the complexity of the system and required modifications. Contractors will need to demonstrate compatibility with existing laboratory infrastructure and propose solutions that meet stringent public health and scientific research standards. Given the specialized nature of the project, prime contractors with direct experience in scientific laboratory water systems will be most competitive. Interested firms should carefully review all documentation and be prepared to provide comprehensive technical and financial proposals that address the State Public Health Laboratory's specific requirements for the deionized water system upgrade.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity