TriTown Water District No. 1 - Existing Filter Rehabilitation

Closed State & local contract opportunity Posted

Solicitation number
72107
State
Vermont
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from vermontbusinessregistry.com. Updated .

About this opportunity

The Tri-Town Water District No. 1 has issued a state and local contract opportunity for the rehabilitation of Filter #3 at their Water Treatment Facility located in Addison, Vermont. This procurement specifically targets the comprehensive replacement of media and internal components within a WesTech Microfloc Trident custom concrete Trident Package Plant that has been underperforming. The primary objective is to restore the filter's operational efficiency through complete media and internal component replacement. The contract opportunity was posted on December 2, 2025, with proposals due by January 6, 2026, at the facility located at 822 Tri-Town Road. Potential bidders will need to demonstrate technical expertise in water treatment facility filter rehabilitation, with a focus on precise removal and replacement of filter media and internal structural components. The project requires detailed technical understanding of municipal water treatment infrastructure and specialized filtration systems. Contractors must be prepared to execute a comprehensive rehabilitation strategy that meets the District's performance standards and municipal water treatment regulations.

While specific set-aside designations are not explicitly detailed in the provided documentation, the project is located in Addison County, Vermont, which may have local or state-level procurement preferences for local or small businesses. The water treatment facility's existing infrastructure suggests potential integration requirements with the current WesTech Microfloc Trident Package Plant system. Bidders should be prepared to provide comprehensive technical documentation demonstrating compatibility and minimal disruption to existing water treatment operations. Although a specific budget range is not provided, municipal water treatment infrastructure rehabilitation projects typically range from $100,000 to $500,000 depending on complexity and scope. Interested contractors should carefully review the full request for proposal documentation to understand complete technical specifications, submission requirements, and potential performance benchmarks for the filter rehabilitation project.

Opportunity text

The primary goal of the project is to rehabilitate Tri-Town Water District No.1's (The District) Filter #3, specifically a WesTech Microfloc Trident custom concrete Trident Package Plant, at their Water Treatment Facility, located at 822 Tri-Town Road, Addison, Vermont, 05491. This filter has been underperforming, and the District desires to rehabilitate it by completely removing and replacing the media and internal components within the filter.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity