Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation
Open State & local contract opportunity Posted
- Solicitation number
- BL148-26
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Anna West anna.west@gwinnettcounty.com (770) 822-7862
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Chandler, Arizona is soliciting bids under BL148-26 for the rehabilitation of Tribble Mill Dam No. 2 (Chandler Lake) in Tribble Mill Park, Gwinnett County, Georgia, with bids due December 9, 2026. The project is a Category II, low-hazard dam rehabilitation, and the attached government file is a notice of bid opening that describes bid submission procedures.
The scope covers installing and maintaining erosion control measures, temporary access roads, and temporary pedestrian access; draining the lake, constructing a cofferdam, and installing and maintaining a water diversion system; demolishing the existing concrete riser, concrete impact basin, and portions of the spillway pipe and internal drain system; and constructing a new concrete riser, concrete impact basin, rip-rap outlet channel, and portions of the spillway pipe and internal drain system. The work also includes installing a cured-in-place pipe lining within the spillway pipe, removing trees including root balls from portions of the dam and auxiliary spillway, performing surface repairs and minor grading, establishing grass cover, and removing all temporary facilities to restore the site.
Opportunity text
This Project includes the following Work: Rehabilitation of a low-hazard (Category II) dam in Tribble Mill Park including: installing and maintaining erosion control measures, temporary access roads, and temporary pedestrian access measures; draining the lake, constructing a cofferdam, and installing and maintaining a water diversion system; demolition of the existing concrete riser, concrete impact basin, and portions of the spillway pipe and internal drain system adjacent to the riser and impact basin; constructing a new concrete riser, concrete impact basin, rip-rap outlet channel, and portions of the spillway pipe and internal drain system adjacent to the riser and impact basin; installing a cured-in-place pipe lining within the spillway pipe; removing trees (including root balls) from portions of the dam and auxiliary spillway, performing surface repairs and minor grading, and establishing grass cover; and removing all temporary facilities and restoring the site including erosion control measures, temporary access roads, temporary pedestrian access measures, and coffer dam.
Files
| File | Type | Posted |
|---|---|---|
| BL148-26 NOT.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity