Three-Phase Distribution Pad-Mount Transformers
Closed State & local contract opportunity Posted
- Solicitation number
- RFI 1100 BAS6001
- State
- Texas
- Responses due
Opportunity facts
- UNSPSC codes
- 39121017 Power distribution units PDUs
- 39121003 Instrument transformers
- 39121706 Transformer bushings
- 39101906 Step down lamp transformer
- 39121025 Buck boost transformer
- 39121027 Encapsulated transformer
- 39121038 Deflecting yoke
- 39121041 Constant voltage transformer
- 39121045 Modulation transformer
- 39121047 Intermediate frequency transformer
Show all 28
- 39121108 Distribution or control board fixtures
- 39101904 Low voltage lighting transformer
- 39121002 Power supply transformers
- 39121026 Control power transformer
- 39121028 Harmonic mitigation transformer
- 39121030 Pad mount transformer
- 39121037 Limiting transformer
- 39121042 Filament transformer
- 39121043 Rotary transformer
- 39121044 Audio frequency transformer
- 39121046 Matching transformer
- 39121109 Transmission transformers
- 39121001 Distribution power transformers
- 39121032 Current transformer
- 39121029 Isolation transformer
- 39121033 Potential transformer
- 39121034 Zero phase current transformer
- 39121720 Transformer handles
- Point of contact
-
- Laura Shotwell bailie.shotwell@austintexas.gov (512) 974-1977
Opportunity details come from financeonline.austintexas.gov. Updated .
About this opportunity
The City of Austin Electric Utility Department is seeking a Request for Information (RFI) for three-phase distribution pad-mount transformers rated between 75 and 2,500 kilovolt-amperes (kVA) at 15 kilovolt primary voltage. This procurement targets self-cooled, compartmental-type, dead-front transformers designed for underground distribution electrical facilities, with a preference for radial-feed and loop-feed configurations. Vendors must provide detailed technical specifications aligned with IEEE, ANSI, and NEMA standards, including comprehensive documentation on transformer characteristics such as core construction, insulation properties, tank design, and testing protocols. Specific requirements include sealed-tank construction with Type II mineral oil, grain-oriented silicon steel cores, and thermally upgraded kraft paper insulation. The RFI mandates that manufacturers have at least five years of experience manufacturing three-phase pad-mounted distribution transformers, with transformer weight not exceeding 16,000 pounds. Key submission requirements include identifying potential specification discrepancies, recommending improvements, confirming manufacturing feasibility, and providing estimated production lead times. The response deadline is January 28, 2026, with submissions to be sent to Gaurav Thakkar, Utility Commodity Manager, at gaurav.thakkar@austinenergy.com.
While the RFI does not explicitly outline set-aside designations or specific vendor restrictions, it emphasizes comprehensive technical compliance and manufacturing capabilities. The procurement process includes rigorous evaluation criteria, with potential financial penalties for transformers exceeding specified loss parameters: a $350 immediate fee plus calculated losses fees of $6.461 per watt for excess no-load losses and $3.379 per watt for excess load losses. Transformers must meet strict performance standards, including the ability to operate across temperatures from -5C to 105C and withstand internal pressures up to 12 pounds per square inch gauge (psig) without rupturing. The specification requires extensive testing, including no-load loss, load loss, excitation current, applied voltage, and lightning impulse testing, with manufacturers required to provide certified test reports. Although no specific budget range is mentioned, the detailed technical requirements suggest a significant investment in high-quality electrical infrastructure. The document indicates this RFI is preparatory to a future procurement process, focusing on gathering vendor input to refine technical specifications and ensure alignment with current manufacturing capabilities and industry best practices.
Files
| File | Type | Posted |
|---|---|---|
| RFI_1100_BAS6001_0500_v1.pdf | ||
| RFI_1100_BAS6001_TECH_DOC_1_v1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity