Thornton Water Project - Fiber Optic Installation

Closed State & local contract opportunity Posted

Solicitation number
12-777XFO
State
Colorado
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Thornton, Colorado is requesting sealed bids for fiber optic cable installation on the Thornton Water Project (Project No. 12-777XFO), with bids due October 8, 2026 at 2:00 p.m. and a mandatory pre-bid conference on September 22, 2026 at 1:00 p.m. Pre-qualification and completion of a non-disclosure agreement are required to access project plans and specifications due to water infrastructure security concerns.

The scope includes installation of approximately 70.6 miles of 72-strand trunk fiber optic cable within existing conduit systems extending from Fort Collins to Thornton, approximately 1,200 feet of 24-strand branch fiber optic cable at six remote locations, approximately 1,400 feet of three 2-inch-diameter conduits using horizontal directional drilling, six handholes, and associated splicing and terminations. Thornton-based businesses are eligible for consideration up to a 5% price discount or $10,000, whichever is less.

Bidders must comply with Colorado licensing requirements and obtain a permit to do business in Thornton prior to bid submission. Each bid must be accompanied by a certified check, cashier's check, or bid bond in the amount of 5% of the total bid. The successful bidder will furnish Performance and Labor and Material Payment Bonds each in the amount of 100% of the total contract price.

The contract is awarded to the lowest responsive and responsible bid. Thornton reserves the right to reject any or all proposals, waive informalities, prequalify or post-qualify bidders, and request financial statements and other qualification information. All reports and documents submitted by the awarded contractor must be in electronic format and comply with Colorado's Anti-Discrimination Act and digital accessibility requirements under House Bill 21-1110. Sealed bids must be submitted to City Hall, 9500 Civic Center Drive, 2nd Floor, Thornton, Colorado.

Opportunity text

This Project consists of approximately 70.6 Miles of 72 strand fiber optic cable installation in existing conduit. Due to security concerns, pre-qualification and completion of a non-disclosure agreement is required for a link to the project plans and specifications.

Files

File Type Posted
biddoc.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity