Temporary Trailer At Station 83 Phase 2-Rebid
Closed State & local contract opportunity Posted
- Solicitation number
- RPQ No MDFRD-898-83-GC
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Roland Bujeiro roland.bujeiro@miamidade.gov (786) 331-4532
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Miami-Dade County Fire Rescue is requesting price quotations for Phase 2 construction services at Fire Station #83 (8141 NW 80th Street, Miami, Florida) under RPQ MDFRD-898-83-GC, with sealed bids due September 3, 2026 at 10:00 a.m. and a mandatory pre-bid meeting and site visit on July 16, 2026 at 10:00 a.m. at the project location. SBE-Services participation is required at 1.0% with recommended set-aside categories including temporary fencing, garbage/refuse equipment rental, sodding, and site work.
The scope is Phase 2 only and excludes all temporary trailer installation work. Deliverables include asphalt removal and disposal; one new gable canvas apparatus awning; three new insulated roof canopies with engineering calculations, shop drawings, and designed footings to accommodate fire engine vehicles (color subject to MDFR approval); two 8'×20' high-cube container structures for a gymnasium on a new reinforced concrete slab with anchoring and cross-fastening; one 8'×20' container for a bunker gear room with 21 wall-mounted lockers; one 8'×20' container for an EMS room with eight metal storage racks; HVAC units with drywells and condensate lines; a new gate controller island with inner loop; new pedestal-mounted dual combo card readers; parking lot striping; and comprehensive electrical and low-voltage work including conduit installation and a new Genetec Mercury 2 card reader system.
The estimated contract value is $1.1 million, excluding contingencies and allowances. The project runs 210 calendar days from an anticipated September 21, 2026 start, with liquidated damages at $250 per calendar day. A 5% bid bond and 100% performance and payment bond are required. Insurance must include Worker's Compensation, Commercial General Liability of $1 million per occurrence and $2 million aggregate, and Automobile Liability of $1 million combined single limit. The contract is subject to a 2% User Access Program fee on all Miami-Dade County payments. Primary contractor must hold a General Building Contractor license; subcontractors must be licensed for concrete work, metal awning/storm shutter, air conditioning, electrical, and low-voltage systems. The contractor is responsible for obtaining and submitting all permits prior to work commencement and must provide daily debris removal, portable toilet provision and maintenance, environmental protection, and a three-year labor warranty following final acceptance.
Opportunity text
CONTRACTOR TO FURNISH THE NECESSARY MATERIALS, EQUIPMENT AND LABOR TO ACCOMPLISH THE FOLLOWING: SCOPE OF WORK- Phase 2 ONLY The work, in general consists of but not limited to the following: For the purposes of this RPQ, the scope of work that follows is strictly limited to Phase 2, herein noted on the provided site plan and accompanied drawings. Contractor is to exclude all work pertaining to the temporary trailer (N.I.C.) noted on the provided site plan and accompanied drawings. All other items on the plans/specifications are to be included. No other work is to be included in this proposal. Layout of Work: The work, in general consists of cut, removal and dispose of existing Asphalt at designated areas as needed to accommodate new concrete slabs for Steel Containers. Make reference to the project contract drawings for site locations and details. Fire Station #83- located at 8141 NW 80th street, Miami, Fl. 33166. New Gable Canvas Apparatus Awning. (Refer to plans for location and details). GC to provide shop drawings for approval prior to fabrication. Canopies are to be inclusive of all asphalt cutting/patching, compaction, engineering calculations, necessary shop drawings, and engineer designed footings required for the structures. Furnish and Install (3) new insulated roof canopies (refer to site plan for locations). Canopies are to be inclusive of all asphalt cutting/patching, compaction, engineering calculations, necessary shop drawings, and engineer designed footings required for the structures. Contractor is to refer to plans for approximate minimum dimensions to accommodate MDFR Fire Engine Vehicles. Color it TBD. GC to provide MDFR PM a color palate prior to purchase and fabrication for approval. Proposed gym w/ (2) 8x20 (High Cube) container structures, shall be installed by the GC on a new 6 min(V.I.F.) concrete reinforced slab. Containers are to be anchored to the new slab and fastened to each other as shown on plans. Contractor to refer to plans and specs regarding interior/exterior finishes and necessary equipment i.e. HVAC, electrical, (see exercise room equipment schedule for list of GC provided exercise equipment). Exercise Fitness & Equipment System: The contractor shall provide the necessary labor, material and equipment to furnish, assemble and install All exercise equipment shown on floor plan & equipment schedule, inside the steel container as shown herein the project contract drawings. Note, window(s) and doors on the containers must have NOAs and have Miami Dade county product approval. Compaction testing and termite treatment to the new slab is by contractor. Compaction reports and termite certificate are to be provided to MDFR pm. Proposed new Bunker Gear Room w/ (1) 8x20 (High Cube) container structure, shall be installed by the GC on a new 6 min (V.I.F.)concrete reinforced slab. Container to be anchored to the new slab and fastened as shown on plans. Contractor to refer to plans and specs regarding interior/exterior finishes and necessary equipment. GearGrid Standard Wall Mounted Lockers: The contractor shall provide the necessary labor, material and equipment to furnish, assemble and install (21) GearGrid wall mounted lockers with doors; Color: Red - 20W x 20D x72H (21-Openings/Bank of 21). Gear Hanger Hanging Rods20, and Gear Hanger Secure Bracket Kits; to be installed inside the steel container as shown herein contract drawings, sheet A-2.0, for details. Bunker Gear containers are to be provided with the appropriate steel backing, to receive full wall height with Diamond Plate finish for wall mounted GearGrid-lockers. GC to coordinate backing type and locations with manufacturer, see herein contract drawings for details. Proposed new EMS room w/ (1) 8x20 (High Cube) container structure, shall be installed by the GC on a new 6 min(V.I.F.) concrete reinforced slab. Container to be anchored to the new slab and fastened as shown on plans. Contractor to refer to plans and specs regarding interior/exterior finishes and necessary equipment. EMS Room: Adjacent to the Geargrid container, contractor shall provide the necessary labor, material and EMS equipment to furnish, assemble and install (8) Metal Storage Racks F1 & F2, to be installed inside the steel container as shown herein contract drawings A-2.0, for details. HVAC, electrical, Note, window(s) and doors on the containers must have NOAs and have Miami Dade county product approval. Compaction testing and termite treatment to the new slab is by contractor. Contractor to include in proposal ALL drywells and condensate lines pertaining to ALL HVAC units within this scope of work, inclusive of asphalt patching and repairs. New HVAC units to be mounted on exterior welded heavy duty, 2 minimum steel angles, painted with rust proof epoxy paint. Containers are to be in new condition. Used containers will not be approved nor accepted. Documentation certifying containers are new are to be provided to MDFR PM. Containers are to be watertight and properly sealed at all new weld areas and new penetrations. GC to provide a new gate controller island. Refer to site plans for locations and details. New Inner loop is also to be included and installed in existing asphalt. Refer to site plan for location. All asphalt cutting/patching and repairs is also to be included. GC to provide and install new pedestal mounted dual combo card reader/keypad. All conduits and wiring are to be provided and installed by contractor. Provide new FDOT thermoplastic parking lot stripping at various locations throughout subject site. Refer to site plans for said locations.
Files
| File | Type | Posted |
|---|---|---|
| miami-dade RPQ_No_MDFRD-898-83-GC.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity