Springfield Water and Sewer Commission is requesting sealed bids to replace a double girder, top running bridge crane at the Cobble Mountain Hydroelectric powerhouse under IFB No. 27-04 (a rebid of IFB No. 26-28), with bids due September 30, 2026 at 2:00 PM EDT and a mandatory pre-bid meeting on September 1, 2026 at 10:00 AM EDT at the Cobble Mountain Powerhouse in Westfield, Massachusetts — attendance required unless the bidder attended the prior pre-bid meeting for IFB No. 26-28.

Prospective general bidders must hold a current certificate of eligibility from the Division of Capital Asset Management and Maintenance (DCAMM) in the "Mechanical Systems" category, along with an updated statement of record since their latest DCAMM certificate. The scope involves removal and replacement of the existing 45-ton rated capacity crane to operate on existing runway and rail with minor modifications. The crane is used for handling larger powerhouse components and hoisting equipment between gallery levels.

The estimated contract value does not exceed $500,000. Work is performed at the Cobble Mountain Hydroelectric powerhouse in Westfield. The project is partially funded by the Department of Energy under Section 243 of the Energy Policy Act of 2005 (as amended by the Infrastructure Investment and Jobs Act of 2021) and through the Water Infrastructure Finance and Innovation Act (WIFIA). Contractors must comply with Davis Bacon wage rates or Massachusetts Prevailing Wage rates as applicable, and are subject to Build America, Buy America Act provisions.

Written questions are due by September 10, 2026. Bid forms and contract documents are available upon request beginning August 18, 2026 from edward.sweeney@waterandsewer.org.

Opportunity text

The Cobble Mountain Hydroelectric powerhouse crane is a double girder, top running bridge crane with a single main hook of 45-ton rated capacity. The existing crane shall be removed and replaced and will operate on the existing runway and rail with minor modifications. The Project is estimated to not exceed $500,000. This is a REBID of IFB No 26-28.

Files

File Type Posted
SWSC IFB No 27-04 Legal Ad.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors