Surface Seal Group 2722
Open State & local contract opportunity Posted
- Solicitation number
- K-27-2512-DBB-3
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Juan Espindola jeespindola@sandiego.gov (619) 533-4491
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of San Diego is soliciting bids for Surface Seal Group 2722, with bids due December 3, 2026. The package covers slurry seal and pavement rehabilitation on existing paved roadways in various areas throughout the City of San Diego, with the posting dated November 3, 2026.
The core scope is rubber polymer modified slurry seal (RPMS) on 51.78 lane miles, supported by crack sealing, asphalt mill and pave, digouts and pavement base repairs, milling and disposal of pavement fabric, and a QA/QC plan with inspection and testing for asphalt and surface seal work. Infrastructure work includes replacing traffic signal detection loops and stub outs, adjusting City manhole frames and covers to grade, raising water and sewer appurtenances and survey monuments to grade, and reconstructing survey monument boxes. Ancillary work includes street and sidewalk sweeping, red curb installation, removal and replacement of thermoplastic striping and legends, new striping plans, traffic control drawings and permits, weed abatement, storm drain inlet protection and markings, and sediment control. Night and weekend work is possible.
Work is confined to the public right-of-way on paved streets or previously disturbed non-sensitive areas outside the City's Multiple Habitat Planning Area, with no sensitive vegetation to be impacted or removed. Storm Water Best Management Practices for erosion control and discharge prevention and a Traffic Control Plan must be implemented throughout construction.
The solicitation includes a specification file, Surface Seal Group 2722.pdf, which is attached to the opportunity.
Opportunity text
Surface Seal Group 2722 involves furnishing all labor, materials, equipment, services, and construction related to slurry seal on existing paved roadways in various areas throughout the City of San Diego. The work includes: placement of rubber polymer modified slurry seal (RPMS) on 51.78 lane miles, crack sealing, asphalt mill and pave, and digouts, pavement base repairs, milling and disposal of pavement fabric, development of a QA/QC plan that includes inspection and testing for asphalt and surface seal work, replacing traffic signal detection loops and stub outs, adjusting existing City manhole frames and covers to grade, raising appurtenances to grade (water, sewer), raising survey monuments to grade, reconstructing survey monument boxes, street and sidewalk sweeping, installation of red curbs, removal and replacement of existing thermoplastic striping and markings/legends, implementation of new striping plans, traffic control drawings & permits, weed abatement, storm drain inlet protection, installation of inlet markings, sediment control, and possible night and weekend work. All work would occur within the public right-of-way (paved streets) or previously disturbed non-sensitive areas only, and outside of the City's Multiple Habitat Planning Area (MHPA). No sensitive vegetation would be impacted or removed. Storm Water Best Management Practices (BMPs) for erosion control preventing discharge, as well as Traffic Control Plan (TCP) would be implemented throughout construction.
Files
| File | Type | Posted |
|---|---|---|
| Surface Seal Group 2722.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity