Stream Debris Removal Project, Waste Collection and Cleanup
Closed State & local contract opportunity Posted
- Solicitation number
- BCSW-FY27-001-StRAP (2024) Phase II
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Nathaniel Woolard nathaniel.woolard@beaufortcountync.gov (252) 946-4989
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Beaufort Soil and Water Conservation District is requesting quotes for stream debris removal work in Beaufort County and Lasker Town, North Carolina, with quotes due September 14, 2026. The scope includes removal of loose debris, logs, trees that have entered the stream, beaver dams that impede flow or navigation, and trees leaning over the creek at 45 degrees or less — all determinations made by the Project Inspector. All removed material must be handled according to the Streamflow Rehabilitation Assistance Program Processing Recommendations.
Strict prohibitions govern the work: no removal of tree stumps from stream banks, no sediment removal from the stream, and no actions outside the stated instructions without additional permits (which are not allowed). Contractors not following these instructions will be terminated immediately. Vendors must demonstrate experience in specialized stream debris removal work and environmental compliance.
The attached Streamflow Rehabilitation Assistance Program document provides processing specifications and environmental regulatory parameters but does not specify contract value, contract term, funding source, pre-quote meeting or site-visit dates, question-submission deadlines, or other procurement-timeline details in the available summary.
Opportunity text
The Beaufort Soil and Water Conservation District is requesting quotes from experienced vendors that specialize in stream debris removal work. Work will consist of the removal of stream debris, waste collection, including beaver dams, which impede stream flow or navigation as determined by the Project Inspector. All trees and debris that have entered the stream as well as any tree leaning over the creek at 45 degrees or less shall be removed. No tree stumps should be removed from stream bank and no sediment should be removed from the stream. Loose stream debris and trees/logs should be removed and handled according to the Streamflow Rehabilitation Assistance Program Processing Recommendations. Any actions outside of these instructions will require additional permits and are not allowed. Any contractor not following these instructions will be terminated immediately.
Files
| File | Type | Posted |
|---|---|---|
| Stream Debris Removal Streamflow Rehabilitation Assistance Program.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity