Stormwater Pump Station #6
Open State & local contract opportunity Posted
- Solicitation number
- 20017
- State
- Virginia
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Ken Peacock kenneth.peacock@norfolk.gov (757) 664-4631
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Chesapeake City, Virginia is soliciting bids for the demolition, replacement, and relocation of electrical control systems at Stormwater Pump Station #6, with proposals due December 18, 2026. The solicitation lists Nathalie CDP as an additional jurisdiction.
The relocation moves control systems and equipment from the pump station control room to the existing generator building. Scope also includes miscellaneous electrical and SCADA control work and all associated site work, including maintenance of traffic. The contractor must keep the pump station in operation to the maximum extent practical during construction. The contractor must design, install, and maintain a bypass pumping system capable of handling a minimum of 2,000 GPM from removal of the existing electrical equipment and controls until startup and acceptance of the new equipment and controls.
Before final completion, the contractor must clean the wet well using the inlets in the travel lane, with personnel access from the center of Tidewater Drive.
Opportunity text
The work includes the demolition, replacement, and relocation of electrical control systems and equipment from the pump station control room to the existing generator building. Also included are miscellaneous electrical and SCADA control work and all associated site work, including maintenance of traffic. The Contractor will be required to keep the pump station in operation to the maximum extent practical during construction. A bypass pumping system capable of handling a minimum of 2,000 GPM will need to be designed, installed, and maintained by the Contractor for the period between the removal of existing electrical equipment and controls and the start-up and acceptance of the new electrical equipment and controls. The Contractor will be required to clean the wet well prior to final completion of the project. Cleaning shall be done using the inlets in the travel lane while personnel access will be from the center of Tidewater Drive.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity