SR5/SR382 water system improvements

Awarded State & local contract opportunity Posted

Solicitation number
CATL160066
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 38
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The Ellijay-Gilmer County Water & Sewerage Authority, Georgia is requesting sealed bids for water main replacement under the SR5/SR382 Water System Improvements project, with bids due May 4, 2023.

The scope encompasses approximately 12,595 linear feet of 12-inch, 8-inch, and 6-inch PC 350 ductile iron pipe (DIP) water main replacement with all related accessories as specified in the contract documents and technical specifications. Bids are solicited on a unit-price basis. The project must achieve substantial completion within 180 calendar days from notice to proceed.

This is a locally funded project. All bidders must purchase contract documents, specifications, and drawings from Goodwyn Mills Cawood, LLC (6120 Powers Ferry Road NW, Suite 200, Atlanta, Georgia 30339) for a non-refundable fee of $150. Each bid must include a bid security deposit equal to 10 percent of the bid amount and must remain valid for 60 days following bid opening. Bidders must submit a bid form, bid bond, qualification form, non-collusion affidavit, and immigration and security form as outlined in Section 00250 of the contract documents.

Contract documents are available for examination at the Ellijay-Gilmer County Water & Sewerage Authority office (1023 Progress Road, Ellijay, Georgia 30540), at Goodwyn Mills Cawood, LLC in Atlanta, and through the Georgia Local Government Access MARKETPLACE. Additional project information and current bidder lists are available at http://www.gmcnetwork.com/bids.

The Authority reserves the right to waive any informalities or irregularities, reject any or all bids, and readvertise the project.

Opportunity text

The Ellijay-Gilmer County Water & Sewerage Authority, Georgia will be receiving separate sealed Bids for all material, labor and equipment for the "SR5/SR382 Water System Improvements". This includes approximately 12,595 L.F. of 12", 8" & 6" PC 350 DIP Water Main Replacement with all related accessories as shown on the plans and called for in the Contract Documents and Technical Specifications. Bids shall be based on Unit Price Items. The project shall be Substantially Complete within 180 calendar days from the date of notice to proceed of the contract. Contract Documents may be examined at the following locations: Ellijay-Gilmer County Water & Sewerage Authority, 1023 Progress Road, Ellijay, GA 30540 Goodwyn Mills Cawood, LLC, 6120 Powers Ferry Rd. NW, Suite 200, Atlanta, Georgia 30339 Georgia Local Government Access MARKETPLACE at the link below: https://www.glga.org/Bid Listings All Bidders are required to purchase Bidding Documents, Specifications and Drawings from the office of Goodwyn Mills Cawood, LLC, upon non-refundable payment of $150.00. Each BIDDER must deposit with his bid, security in the amount of 10%, and shall be subject to the conditions provided in Section 00200 "INSTRUCTION TO BIDDERS." No BIDDER may withdraw his bid within sixty (60) days after the date of Bid opening. Each Bidder is required to submit a "Bid form", "Bid Bond", "Form of Qualification of Bidder", "Non-Collusion Affidavit" and "Immigration and Security Form" as outlined in Section 00250. This contract is Local funded. The Ellijay-Gilmer County Water & Sewerage Authority reserves the right to waive any informalities or irregularities, or to reject any or all bids and to readvertise. Visit http://www.gmcnetwork.com/bids for a list of projects out for bid. Then select the appropriate project for a list of bidders and additional bid information.