SR187 over Wysox Creek Bridge Replacement

Open State & local contract opportunity Posted

Solicitation number
99278
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Pennsylvania Department of Transportation (PennDOT) is soliciting design-build proposals for bridge replacement and associated roadway work on State Route 187 in Rome Township, Bradford County, with proposals due December 10, 2026 at 11:00 a.m. The project carries zero percent DBE set-asides and requires prequalification.

The scope encompasses a two-span bridge replacement over Wysox Creek, mill and overlay, drainage improvements, guiderail installation, pavement markings, and miscellaneous construction across 97 line items including 1,469 cubic yards of Class 1 excavation, 655 tons of Superpave asphalt base course, and 252 tons of wearing course asphalt. All materials must comply with Buy America and Build America provisions. Heavy construction wage rates apply to bridge structure work; highway construction wage rates apply to approach work and miscellaneous items. The design-build method requires bidders to identify professional service firms and disclose conflicts of interest per 23 CFR 636 organizational conflict-of-interest restrictions.

The estimated cost range is $2.5 to $5 million. The anticipated notice to proceed is January 25, 2027, with required completion by November 13, 2028. Bid opening will be held at the Commonwealth Keystone Building in Harrisburg. Contractors must submit Worker Protection and Investment Certification Forms within seven calendar days after bid opening. The project includes special provisions addressing environmental compliance, erosion and sediment control, and infiltration testing for stormwater management. All addenda will be posted electronically through ECMS. No pre-bid meeting is scheduled.

Opportunity text

The description and location of the project are as follows: a design-build bridge replacement of the existing two-span bridge over Wysox Creek, mill and overlay, drainage, guiderail, pavement markings and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 187, Section 074, in Rome Township, Bradford County from approximately 300 feet west of the intersection of SR 187 and SR 1055 at segment 0670 offset 0297 to approximately 1.3 miles east of the intersection of SR 187 and SR 1036 at segment 0680 offset 0831.

Files

File Type Posted
850096padot99278.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors