SR 500 NE Robinson Rd and NE 3rd St. Intersection Safety Improvements

Closed State & local contract opportunity Posted

Solicitation number
XE3776, FA Proj No HSIP-0500(026)
State
Washington
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Clark County, Washington is requesting bids on intersection safety improvements at SR 500 NE Robinson Road and NE 3rd Street, involving installation of compact roundabouts and associated roadway work, with proposals due October 21, 2026.

The scope encompasses 86 work items across work classes 1 (clearing, grubbing, grading, and draining), 2 (production and placement of crushed material), and 4 (asphalt concrete paving). Deliverables include roundabout construction, roadway excavation, embankment compaction and shoulder finishing, bituminous pavement planing, hot mix asphalt and textured pigmented cement concrete paving, roundabout curbs and gutters, drainage pond and ditches, erosion control, illumination systems, permanent signing and pavement markings, guardrail, fencing, and landscaping. The project schedule is 46 working days. Detailed technical specifications, material requirements, testing standards, and acceptance criteria are provided in the specifications document (22 MB PDF).

The proposal due date is October 21, 2026. No estimated contract value, set-aside or preference program, incumbent information, or evaluation criteria weightings are identified in the source material.

Opportunity text

Requires installation of compact roundabouts at the intersections of NE 3rd Street and SE Robinson Rd., roadway excavation, embankment compaction, shoulder finishing, planing bituminous pavement, paving with hot mix asphalt (HMA), textured and pigmented cement concrete pavement, various roundabout curbs and gutters, drainage pond and ditches, erosion control, illumination system, permanent signing, pavement markings, guardrail, fencing, landscaping, traffic control and other work. 46 working days. Involves 86 items. Work class 1, clearing, grubbing, grading and draining or work class 2, production and placing of crushed material and work class 4, asphalt concrete paving.