SR 4015 ov Tb Sugar Creek Bridge Replacement

Closed State & local contract opportunity Posted

Solicitation number
89906
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Pennsylvania Department of Transportation is requesting sealed bids for furnishing and installing a corrugated metal pipe arch culvert (11'-10" X 7'-7") and related construction on State Route 4015, Section 005 in Troy Township, Bradford County, with bids due August 13, 2026 at 11:00 a.m. at the Commonwealth Keystone Building in Harrisburg. Prequalification is required to bid. This is a 100% state-funded, non-federally funded project classified as a bridge replacement.

The scope includes 48 linear feet of corrugated aluminized steel pipe arch; mobilization; narrative schedule preparation; selective tree removal with seeding and mulching; maintenance and protection of traffic; 338 pounds of reinforcement bars; and precast reinforced concrete inlet and outlet sections. Work is performed at the Department-prepared site on State Route 4015, approximately 1.57 miles north of SR 6 in Troy Township.

The estimated contract value falls between $100,000 and $199,999.99, with structure work comprising 74% of the total. The contract requires prevailing wage rates. The anticipated Notice to Proceed is September 28, 2026, with required project completion by May 7, 2027. No pre-bid meeting is scheduled.

The contract includes mandatory provisions covering equal employment opportunity, worker protection and investment requirements, reciprocal limitations act compliance, erosion and sediment pollution control, post-construction stormwater management, anti-pollution measures, right-to-know law compliance, and Build America/Buy America Act compliance. Material certifications must be submitted electronically through the Electronic Construction Management System (ECMS), through which all addenda are posted.

Opportunity text

The description and location of the project are as follows: Furnish and install corrugated metal pipe arch culvert (11'-10" X 7'-7"), tree removal and other miscellaneous construction at a Department prepared site, as indicated on the approved drawings included in the bid package for State Route 4015, Section 005, in Bradford County, Troy Township from approximately 1.57 miles North from SR 6 at segment 0040 offset 0478 to approximately 1.57 miles North from SR 6 at segment 0040 offset 0490.

Files

File Type Posted
832881padot89906.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity