SR 3005 over Grassy Run - DFB Bridge Replacement
Open State & local contract opportunity Posted
- Solicitation number
- 74185
- State
- Pennsylvania
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Pennsylvania Department of Transportation (PennDOT) District 12 is requesting bids for the design, fabrication, and delivery of two precast reinforced concrete box culverts, three precast reinforced concrete end sections, and two precast reinforced concrete wingwalls for State Route 3005 in Springhill Township and State Route 1039 in Dunbar Township, Fayette County, with bids due October 22, 2026 at 11:00 a.m. Prequalification is required.
The work is 100% state-funded and non-federal. Drawings S-43687 and S-43947 specify the precast elements and delivery requirements to department-prepared sites. Contractors must submit the Worker Protection and Investment Certification Form (BOP-2201) within 7 calendar days after bid opening and obtain shop drawing and fabrication approvals from the PennDOT District 12 Bridge Maintenance Coordinator before fabrication begins.
The project budget ranges from $500,000 to $999,999.99. Bid items include narrative schedule, two lump-sum precast box culvert line items, and an $80,000 unforeseen structure handling allowance at $1.00 per dollar. Box culvert delivery carries liquidated damages of $1,000 per day for the S-43687 culvert (deadline July 23, 2027 or two weeks after Department notification, whichever is later) and $1,000 per day for the S-43947 culvert (deadline September 24, 2027 or two weeks after Department notification, whichever is later). Prevailing wage rates apply. The contract requires Build America Buy America Act compliance and Reciprocal Limitations Act compliance.
The anticipated Notice to Proceed is December 7, 2026, with required project completion by December 30, 2027. Public bid opening occurs at the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg, Pennsylvania. No pre-bid meeting is scheduled.
Opportunity text
The description and location of the project is as follows. The design, fabrication, and delivery of two Precast R.C. Box Culverts, three Precast R.C. End Sections, and two Precast R.C. wingwalls at department prepared sites, as indicated on the approved drawings (S-43687, S-43947) including in the bid package for State Route 3005 Segment 0010 Offset 0395 in Springhill Township, Fayette County, and State Route 1039 Segment 0050 Offset 0000 in Dunbar Township, Fayette County.