SR 3001: President Rd. - SR 36 Resurfacing

Open State & local contract opportunity Posted

Solicitation number
89181
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Pennsylvania Department of Transportation (PennDOT) is soliciting bids for the resurfacing of State Route 3001 from President Road to SR 36 in Forest County, with bids let December 3, 2026 at 11:00 a.m. at the Commonwealth Keystone Building in Harrisburg. Prequalification is required for bidders.

The project covers approximately 4.15 miles of overlays with Superpave asphalt mixtures, plus guiderail, delineators, and asphalt wedge curb, per approved drawings in the bid package. Quantities include 4,100 linear feet of Type 31-S guiderail, approximately 92,249 square yards of tack coat, 6,412 tons of binder course leveling, and 2,076 tons of scratch course. District 01 specification changes modify sections covering asphalt mixture design, material control, traffic signal installation, and cement concrete structures.

The project is classified as a standard, 100% state-funded resurfacing effort with no federal participation, so Buy America provisions do not apply. Pennsylvania Prevailing Wage Act rates apply. Contractors must submit the Worker Protection and Investment Certification Form (BOP-2201) within seven calendar days after bid opening. Special provisions cover erosion and sediment pollution control, post-construction stormwater management, the Right-to-Know Law, and the Reciprocal Limitations Act.

The estimated cost range is $1.0 million to just under $2.5 million. The contract includes liquidated damages for failure to complete physical work by August 27, 2027, and mainline pavement payment is not finalized until May 5 of the year following final wearing course placement.

The anticipated notice to proceed is January 19, 2027. Physical work must be completed by August 27, 2027, with exceptions for erosion and sediment controls. The required completion date is May 5, 2028, and final acceptance will not be issued before that date to allow for pavement review. All addenda will be posted electronically through the Engineering and Construction Management System (ECMS).

Opportunity text

This project is the construction of approximately 4.15 miles from SR 3001/Segment 0090/Offset 1453 to SR 3001/Segment 0170/Offset 2594, including overlays with Superpave Asphalt Mixtures, guiderail, delineators, and asphalt wedge curb, as indicated on the approved drawings included in the Bid Package.

Files

File Type Posted
853103padot89181.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors