About this opportunity

Pennsylvania Department of Transportation is soliciting bids for safety improvements and pavement widening on State Route 209 in Monroe County, from Holy Cross Road to Middle Smithfield Elementary Drive, with bids due October 1, 2026 at 11:00 a.m. The project is federally funded and requires prequalification; no pre-bid meeting is scheduled.

The scope covers 0.464 miles of pavement widening, realignment and widening of SR 2023 (Hollow Road) to a T intersection with SR 0209, retaining wall installation, traffic signal improvements, drainage infrastructure, guiderails, pavement markings, and miscellaneous construction. The bid package includes over 150 line items: clearing and grubbing (lump sum), Class 1 and 2 excavation (5,115 and 252 cubic yards respectively), multiple asphalt pavement courses totaling approximately 29,959 square yards, drainage pipes and structures, concrete work, erosion control measures, traffic management items, and environmental compliance features including bog turtle exclusion barriers and stormwater management controls. Structural work comprises 6 percent of the project scope.

The estimated contract value ranges from $2.5 million to $5 million, with pricing submitted on a per-unit basis for individual line items and lump sum amounts for mobilization, surveying, and specialized work. The contract is classified as a Standard federal project with National Highway System designation. The anticipated notice to proceed is November 16, 2026, with required completion by June 20, 2029.

The project is subject to Buy America requirements, prevailing wage rates, and a 0% mandatory DBE participation goal. Material certifications must be submitted electronically through PennDOT's Environmental and Compliance Management System (ECMS). The bid package includes 119 pages of specifications covering construction procedures, quality assurance testing, erosion and sediment control, Post Construction Stormwater Management (PCSM) plans, and NPDES permit compliance.

Opportunity text

The project consists of 0.464 miles of safety improvements and pavement widening of SR 0209 from the Holy Cross Road intersection to Middle Smithfield Elementary Drive. The project also includes the realignment and widening of SR 2023 (Hollow Road) to a T intersection with SR 0209. The project also includes a retaining wall along SR 0209, traffic signal improvements, drainage improvements, traffic signing, guiderail, pavement markings and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 209, Section 03S, in Monroe County in Middle Smithfield Township from segment 0540 offset 2505 to segment 0550 offset 2494.

Files

File Type Posted
841571padot95398.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors