SR 11 & SR 92 Intersection Improvement
- Pennsylvania Department of Transportation (PennDOT) is soliciting bids for mill-and-overlay resurfacing on State Route 42 and State Route 11 in Montour Township and the Town of Bloomsburg, Columbia County, with bids due July 16, 2026 at 11:00 a.m. This is a prequalification-required, 100% state-funded standard construction contract. The scope spans 1,920 linear feet (0.36 miles) on SR 42, Section 144, and includes mill-and-overlay work extending 100 feet from bridge approaches; superpave asphalt...
- The Pennsylvania Department of Transportation (PennDOT) is requesting bids for sidewalk improvements on State Route 23 (Main Street) in Upper Leacock Township, Lancaster County, with bids due July 30, 2026 at 11:00 a.m. at the Commonwealth Keystone Building in Harrisburg. The project is federally funded and subject to Buy America provisions, Executive Order 11246, Title VI non-discrimination assurances, and Disadvantaged Business Enterprise (DBE) requirements with a 0% DBE goal. The scope...
- Pennsylvania Department of Transportation (PennDOT) is requesting bids for upgrades and enhancements to its Intelligent Transportation System (ITS) infrastructure across Cumberland, Dauphin, Franklin, Lancaster, and York Counties under four MPMS contracts, with bids due July 30, 2026 at 11:00 a.m. at the Commonwealth Keystone Building in Harrisburg. Prequalification is required. This is a federally-funded construction contract with a DBE set-aside of zero percent and wage-rate requirements....
- The Pennsylvania Department of Transportation is requesting bids for the I-83 South Bridge AMTRAK Early Action Project on State Route 0083, Section OCS, in Dauphin County, Harrisburg, with bids due July 30, 2026. This is a state-funded (100 percent non-federal) construction project subject to prevailing wage requirements and mandatory contractor prequalification. The work spans 1,000 linear feet from South Front Street to Paxton Creek. The scope includes installation of drilled caisson...
- The Pennsylvania Department of Transportation is requesting sealed bids for demolition of six residential parcels and associated miscellaneous construction work on the PA 63/PA 309 Connector Phase 3 project in Hatfield and Hilltown Townships, Bucks and Montgomery Counties, with bids due July 30, 2026 at 11:00 a.m. This is a 100% state-funded project subject to prevailing wage requirements and contractor prequalification. The scope encompasses lump-sum demolition of six parcels (132, 133, 134,...
- The City of Pittsburgh Office of Management & Budget, on behalf of the Department of Mobility & Infrastructure, is soliciting bids for the construction of traffic signal replacements at Beechwood/Linden/Wilkins and Brownsville/Maytide/Sankey intersections, with bids due July 15, 2026. This is a prevailing-wage project subject to Davis-Bacon wage determination PA20260002, effective May 18, 2026, covering heavy and highway construction across 32 Pennsylvania counties including Allegheny...
The Pennsylvania Department of Transportation is soliciting bids for intersection improvement at the State Route 11 (Wyoming Avenue) and State Route 92 (Exeter Avenue) intersection in West Pittston Borough, Luzerne County, with bids due July 30, 2026 at 11:00 a.m. Prequalification is required. This is a federally-funded National Highway System project subject to Buy America and Build America, Buy America Act compliance. The scope includes installation of a new temporary traffic signal, ADA-compliant ramps, concrete curbing and sidewalks, pavement markings, signing, excavation, asphalt and concrete placement, erosion and sediment control, and traffic control devices. Work extends from approximately 1.41 miles east of the SR 1027 / SR 11 intersection to approximately 0.24 miles west of the SR 2006 / SR 11 intersection. The bid package comprises approximately 71 pages of specifications with line items ranging from single units to 1,335 linear feet and lump-sum mobilization, surveying, and equipment items. The estimated project cost falls between $200,000 and $499,999.99. No DBE set-aside percentage is specified. The anticipated Notice to Proceed is September 14, 2026, with required project completion by March 12, 2027. The contract includes wage rate requirements and extensive special provisions governing construction and holiday work restrictions, public notification, erosion and sediment control permitting, material storage and prepayment, pavement ride quality evaluation with incentive payments, concrete compressive strength testing with payment adjustments, and prohibition on unmanned aircraft systems manufactured by covered foreign entities. Multiple addenda address specification changes and material certification requirements, electronic ticketing for aggregates and concrete, and post-construction stormwater management documentation including NPDES Notice of Termination. The public bid opening is held at the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg, Pennsylvania.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
832218padot122736.pdf | 880KB | 7/8/26 |