About this opportunity

Pennsylvania Department of Transportation is soliciting bids for replacement of a single-span reinforced concrete slab bridge structure over DuBois Creek with a precast reinforced concrete box culvert on State Route 1018 (Booth Road) in Susquehanna County, Franklin Township, with bids due October 22, 2026 at 11:00 a.m. Prequalification is required. The project is 100% state-funded (non-federally funded) heavy construction.

The scope encompasses bridge structure replacement, roadway approach work, guide rail replacement and delineators, traffic control maintenance, erosion and sediment control measures, seeding and mulching, and temporary construction controls. The overall project length is 235 feet (0.045 miles), extending from Station 159+90.00 to Station 163.25.00. Traffic on Booth Road will be detoured during construction. Heavy construction wage rates apply to the bridge structure; highway construction wage rates apply to other work. Road User Liquidated Damages of $1,765.00 per day will be assessed for each day the detour remains in place beyond 77 calendar days from implementation.

The estimated project cost range is $500,000 to $999,999.99. The anticipated Notice to Proceed is December 7, 2026, with a required completion date of August 12, 2027. The project includes numerous special provisions addressing construction restrictions, environmental compliance including stream protection during the restricted season (October 1 through December 31), wetland protection, notifications to emergency services and school districts, and Pennsylvania Worker Protection and Investment requirements. Contractors must submit completed BOP-2201 Worker Protection and Investment Certification Forms within seven calendar days after bid opening. An alternate erosion and sediment pollution control plan is permitted with prior approval from PennDOT and the County Conservation District or Department of Environmental Protection. No pre-bid meeting is scheduled. All addenda will be posted electronically through ECMS.

Opportunity text

This project consists of replacement of the existing single span reinforced concrete slab structure over Dubois Creek with a precast reinforced concrete box culvert. Traffic on SR 1018/T-768 (Booth Road) will be detoured during construction. The project also includes roadway approach work, guide rail replacement, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for State Route 1018, Section 550 (Local Road T-768), in Susquehanna County, Franklin Township from Segment 0050 Offset to Segment 0050 Offset 0014, with T-768 extending from STA 159+90.00 to STA 163.25.00 and an overall project length of 235.00 feet (0.045 miles).