The City of Waco, Texas is requesting bids on the Speegleville Road Lift Station Improvements Project (60WA2303A), with proposals due August 12, 2026. The scope encompasses complete installation and construction of a new wastewater lift station facility, including associated piping, electrical systems, controls, generator relocation, temporary by-pass systems, site improvements, fencing, and surface replacement as detailed in the project drawings and specifications.
The contractor is responsible for all labor, materials, equipment, appurtenances, and incidentals necessary to properly install, complete, and achieve acceptance of the lift station and integrated components. Work must be performed in strict accordance with project plans, specifications, and applicable codes and standards established by the City of Waco. The contractor must also coordinate site work, implement temporary traffic control, maintain environmental protection measures, and restore all disturbed areas.
The contract is governed by Texas Department of Criminal Justice Standard Terms and Conditions. Contractors must comply with insurance, bonding, and permitting requirements and adhere to applicable federal, state, and local regulations governing construction and public works projects in Texas.
Bidding materials, including detailed project specifications and submittal requirements, are available on the TDCJ Procurement Portal at https://tdcj.bonfirehub.com. Technical support is available through Euna Solutions at support.bonfire@eunasolutions.com. The project is located in McLennan County, Texas.
Opportunity text
The major work shall generally consist of but is not limited to all labor, materials, equipment, appurtenances, and incidentals as required to properly install, complete and be accepted in place the Speegleville Road Lift Station and associated piping, electrical, controls, generator relocation, temporary by-pass system, site improvements, fencing, surface replacement, and all necessary components as shown on the project drawings and as specified herein.
Files
| File | Type | Posted |
|---|---|---|
| 2-Submittals- IW258634.pdf | ||
| 3-01. IW258634.pdf | ||
| 1-02. TDCJ Standard Terms Conditions.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity