Speegleville Rd. Utility Improvements

Solicitation # RFB2025055
Posted 7/21/25, 3:07 AM
No Updates
Due 9/16/25, 3:00 PM
State
Texas
Source
View
Similar Opportunities
The City of Waco, Texas has issued a Request for Bid (RFB No. 2025-039) for Water and Sewer Repair Materials to be utilized by the city's Water and Sewer Utilities for installation and maintenance of water and sewer infrastructure. The procurement is structured as a multi-award contract with a three-year term, designed to ensure adequate supply, pricing, availability, and responsiveness across multiple vendors. The solicitation covers an extensive range of water and sewer repair materials...

The City of Waco, Texas is soliciting bids for the Speegleville Road Utility Improvements project (RFB No. 2025-055), a comprehensive infrastructure upgrade located in Schleicher County. The procurement involves installing approximately 1,950 linear feet of 24-inch PVC waterline, 1,275 linear feet of horizontal directional drilling crossing the Middle Bosque River using 42-inch HDPE casing, 1,530 linear feet of 18-inch PVC gravity wastewater line, and 1,600 linear feet of horizontal directional drilling with 16-inch HDPE force main. Key deliverables include a temporary by-pass system, abandonment of existing waterlines and wastewater lines, surface replacement, and road repair. Bidders must complete a rigorous prequalification process demonstrating technical competence, with specific requirements for waterline and wastewater line project experience involving 18-24 inch pipe diameters and minimum 1,000 linear foot project lengths. The pre-bid meeting is scheduled for August 5, 2025, at 10:00 A.M. CT via Zoom, with bid submissions due by September 16, 2025, at 2:00 P.M. CT. Evaluation criteria include purchase price, contractor reputation, service quality, past relationships, and compliance with historically underutilized business regulations.

The procurement appears to have no specific set-aside designations, but contractors must demonstrate robust organizational capabilities, including comprehensive safety records, insurance compliance, and financial stability. Both general contractors and horizontal directional drilling subcontractors are required to submit detailed prequalification documentation covering company history, key personnel experience, organizational structure, and past project performance. The engineering estimate for the project is $8.5 million, with a liquidation fee of $1,000 per day of project delay. Bidders must submit a bid bond or certified check for 5% of their submission amount, and the City will award the contract to the lowest responsible bidder. The project has a 360-calendar day completion timeline from the Notice to Proceed, with the City tentatively planning to make a final selection and award by October 16, 2025. Successful contractors will need to provide evidence of technical competence, safety programs, and organizational experience in similar large-scale utility infrastructure projects.

Generated 7/21/25, 8:32 PM