Specifications for 2026 - 2028 Distribution and Transmission Rates for Storm Relief
Awarded State & local contract opportunity
- Solicitation number
- 2025-01
- State
- North Carolina
- Responses due
Opportunity facts
- NIGP codes
- UNSPSC codes
- 72151502 Electric power system construction service
- 81102402 High voltage overhead line maintenance and repair
- 72141126 Underground utilities construction service
- 72151503 Cogeneration plant construction service
- 81102401 High voltage overhead line construction
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 72151506 Switchgear and related devices installation service
- 72141111 Gas main construction service
- 72141114 Pipeline wrapping service
Show all 20
- 72141113 Oil and gas pipeline construction service
- 72141122 Electric power line construction service
- 72151504 Computer power conditioning service
- 72151505 Standby or emergency power installation service
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 72154300 Motive and electrical power generation equipment maintenance and repair services
- Points of contact
-
- Tucker Lemley tlemley@halifaxemc.com
- Tyler Harriett tharriett@halifaxemc.com
- John Lassiter jlassiter@halifaxemc.com
Updated .
About this opportunity
Halifax Electric Membership Corporation (HEMC), serving approximately 12,000 members across four North Carolina counties, has issued a Request for Proposal (RFP) for distribution and transmission storm relief crews to respond to damage from hurricanes, ice storms, and tornados during the 2026-2028 contract period. The procurement seeks qualified contractors capable of providing emergency response crews that can be activated on an as-needed basis by HEMC. Proposal submissions are due by 2:00 p.m. on December 12, 2025, through the VendorLink portal, with a question submission deadline of December 10, 2025. Contractors must submit detailed proposals including hourly rates for line workers at regular, overtime, and double-time rates, equipment availability, standby rate calculations, and comprehensive insurance documentation. The evaluation will be based on a weighted selection criteria: Qualifications of the Contractor (20 points), Availability (25 points), Relevant Past Performance (35 points), and Cost Proposal (20 points). Proposals must include a title page, table of contents, signed cover letter, firm overview, expertise statement, and at least three client references from comparable projects within the past five years.
The RFP does not specify any specific set-aside designations or restrictions for disadvantaged enterprises. HEMC has already awarded contracts to five vendors: C-Phase Services, LLC; Lee Electrical Construction, LLC; Osmose Pike Electric, LLC; River City Construction, Inc.; and TRC Engineers. The contract structure allows for maximum flexibility, with no guaranteed minimum work volumes and a maximum ceiling price of one million dollars for all services under the agreement. Contractors must maintain comprehensive insurance coverage, including $1,000,000 per occurrence general liability, $2,000,000 excess liability, $1,000,000 automobile liability, and statutory workers' compensation. Price adjustments are permitted annually on January 1st, limited to the lesser of a fixed percentage submitted by the provider or the Consumer Price Index for the preceding twelve months. The agreement becomes effective on March 1, 2024, and continues through December 31, 2028, with HEMC retaining the right to terminate the agreement or individual service exhibits at any time with written notice.
Opportunity text
HEMC has identified the possible need for additional distribution and transmission crews in the event of storm damage. The goal of this Contract is to provide HEMC during 2026 through 2028 with crews capable of performing the jobs assigned. The work will be typical for that as a result of hurricanes, ice storms, and tornados. Start date will be determined on an as needed basis determined by HEMC. Duration will be determined by HEMC.