The City of Lafayette and Parish Consolidated Government is requesting sealed bids for South Water Plant Silos Rehabilitation under IFB, with bids due August 19, 2026 at 11:00 a.m. The prebid conference was held August 5, 2026 at 2:00 p.m. (now past). The project has some or all local funding, which may impose additional requirements on bidders.

The scope includes removal and disposal of four existing dust collectors from the roof of the South Water Treatment Plant and installation of new dust collectors, compressor, dryer, pressure relief valves, piping, and associated electrical facilities and controls. Work also encompasses modifications to an existing crane system, including foundation modifications, installation of frames, removal of the existing coiling door, and replacement with a double door.

The estimated project value is $375,000. A 5% bid bond is required. Bids are submitted electronically through the Lafayette Consolidated School District portal at https://lafayettecsdgovla.tylerportico.com/va/vendor-access/registration.

Bidders requesting further information or written interpretations of plans and specifications must submit requests to the Purchasing Division at least seven working days before the bid opening. Plans and bid packages are available electronically from Dabne Dover at dabnedover@lafayettela.gov or through the Tyler Portico portal and the designer's website (https://www.dsaengineering.com). The designer of record is Domingue, Szabo & Associates, Inc. Questions regarding bidding documents should be directed to Dabne Dover at 337-291-8262 or the Purchasing Division at 337-291-8200.

Opportunity text

The work includes removal and disposal of (4) existing dust collectors on the roof of the south water treatment plant and installation of new dust collectors, compressor and dryer, pressure relief valves, piping, and associated electrical facilities and controls and other appurtenant and related items of construction. The work also includes modifications to an existing crane system including foundation modifications, installation of frames, removal of the existing coiling door and replacing with a double door.