South Main Trail Connection Project
Open State & local contract opportunity Posted
- Solicitation number
- TAP-4301107
- State
- Missouri
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Sassan Mahobian sassan@skdg.com
- Stephen Brefo sbrefo@skdg.com
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Maryville, Missouri is requesting sealed bids for construction of approximately 570 linear feet of new 10-foot-wide concrete trail connecting the existing trail at the north side of Mosaic Medical Center to the existing sidewalk at South Main Street, with bids due November 10, 2026 at 2:00 p.m. at the Maryville Public Safety Facility, 101 N. Vine Street. A pre-bid conference is scheduled for October 28, 2026 at 2:00 p.m. at the same location.
All work must comply with prevailing wage requirements established by the Missouri Department of Labor and Industrial Relations, with the federal or state wage rate applied, whichever is higher. Contractors must be listed on MoDOT's Qualified Contractor List per Section 102.2 of the current Missouri Standard Specifications for Highway Construction; contractor questionnaires are required on file seven days prior to bid opening. The project carries a DBE goal of 0 percent with zero On-the-Job Training requirements and no second-tier subcontracting permitted. All on-site employees must complete a 10-Hour OSHA construction safety program or equivalent within sixty days of project commencement.
Bidders must submit either a certified or cashier's check or a bid bond equal to 5 percent of the proposal amount. Bidding documents are available for purchase through Drexel Technologies via their eDistribution plan room at www.drexeltech.com or distribution@drexeltech.com and are available for examination at City Hall, 415 N. Market Street, Maryville, MO 64468. The project manager is Stephen Brefo, SK Design Group, Inc., reachable at 816-510-1126 or sbrefo@skdg.com. The City of Maryville reserves the right to reject any or all bids.
Opportunity text
Construction of approximately 570 linear feet of new 10-foot-wide concrete trail from existing trail at the north side of Mosaic Medical Center (west end of new trail) and connecting to existing sidewalk at South Main Street (east end of new trail)
Files
| File | Type | Posted |
|---|---|---|
| TAP-4301107.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity