South Creek Greenway (Fremont to Glenstone)

Closed State & local contract opportunity Posted

Solicitation number
2778
State
Missouri
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Springfield, Missouri is seeking bids on the South Creek Greenway project (CRP-5901(830) and CRP-5901(839)), consisting of multi-use path and pedestrian crossing construction along Sunset Street and Glenstone Avenue, with proposals due September 3, 2026.

Project CRP-5901(830) encompasses approximately 22,500 square feet of concrete sidewalk, 400 square feet of concrete ADA ramp, 2,300 square feet of concrete driveway, and 770 linear feet of curb and gutter along the south side of Sunset Street from Fremont Avenue to Glenstone Avenue, plus fiber extension and traffic signal replacement at the Sunset Street and Battlefield Mall Access Drive intersection. Project CRP-5901(839) includes pedestrian crossing improvements at the Sunset Street and Glenstone Avenue intersection, featuring approximately 250 square yards of concrete sidewalk, 85 square yards of concrete curb ramp, 290 linear feet of concrete gutter (Type B), stormwater improvements, fiber extensions, and pedestrian signal upgrades to connect to existing MoDOT and City sidewalk infrastructure and a City Utilities bus stop.

The source document does not specify contract value, contract term, evaluation criteria, pre-bid meeting or site-visit dates, incumbent contractor, set-asides or preference programs, or other procurement timeline milestones beyond the September 3 proposal due date. Contractors should obtain complete bidding documents and specifications from the City of Springfield to determine cost estimation parameters, project schedule requirements, insurance and bonding obligations, and other contractual terms.

Opportunity text

Project CRP-5901(830) consists of constructing a multi-use path along the south side of Sunset Street from Fremont Avenue to Glenstone Avenue and replacement of the traffic signal at the intersection of Sunset Street and the Battlefield Mall Access Drive. Main elements of work include: approximately 22,500 SF of Concrete Sidewalk, approx. 400 SF of Concrete ADA Ramp, approx. 2,300 SF of Concrete Driveway (Commercial), approx. 770 linear feet of Curb and Gutter, fiber extension items, and signal improvement items Project CRP-5901(839) consists of constructing pedestrian crossings at the intersection of Sunset Street and Glenstone Avenue, making a connection to the CRP 5901(830) project, connecting to existing MoDOT/City sidewalk on the east side of the intersection, extending a sidewalk along the West side of Glenstone Avenue to a City Utilities bus stop south of Sunset Street, pedestrian signal improvements, and associated stormwater improvements. Main elements of work include: approximately 250 SY of Concrete Sidewalk, approx. 85 SY of Concrete Curb Ramp, approx. 290 LF of Concrete Gutter (TYPE B), associated stormwater improvements, fiber extension items, and signal improvement items.

Files

File Type Posted
South Creek Greenway (Fremont to Glenstone).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors