Solar Streetlight Project - Phase 3

Open State & local contract opportunity Posted

Solicitation number
8385
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

San Diego County, California is soliciting bids for the receipt, storage, transport, and installation of 125 solar streetlights under the Solar Streetlight Project - Phase 3, with a due date of November 25, 2026. The source names no set-aside, preference, or sole-source restriction.

The scope includes galvanized steel and concrete light poles, solar modules, power centers, batteries, luminaires, and all associated materials and equipment, described as "including but not limited to." Installation work covers excavation and spoils disposal, concrete placement and reinforcement, pole erection, power pack and solar module installation, and conduit and circuitry work. It also includes curb, gutter, sidewalk, and water line repair of work-related damage "if necessary," along with permits, notices to affected households, traffic and parking control, safety procedures, and erosion control and stormwater best management practices.

The solicitation package is attached as a 22MB PDF titled "Solar Streetlight Project - Phase 3.pdf," which was posted October 25, 2026.

Opportunity text

The Work generally consists of: receiving, storing, transporting to the installation location and installing 125 solar streetlights including but not limited to, galvanized steel and concrete light poles, solar modules, power center, batteries, luminaires, and all materials and equipment associated with the installation of the solar streetlights. Installation includes excavation, spoils removal and disposal, concrete placement, concrete reinforcement, mounting brackets, anchor bolts, base plates, streetlight pole erection, power pack installation, solar module installation luminaire installation, curb, gutter, sidewalk, conduit, circuitry and water lines repair of work related damage if necessary, rental equipment, hoisting equipment, signage, posting of signs, notices and posting notifications to affected households, notification permits, safety equipment and safety procedures, traffic and parking control equipment and materials, erosion control and BMP storm water protection measures.

Files

File Type Posted
Solar Streetlight Project - Phase 3.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors