SMF Pedestrian Walkway - Riparian Public Art Installation Project
Open State & local contract opportunity Posted
- Solicitation number
- 41016
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Terry Keys keyst@saccounty.gov (916) 876-6367
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Sacramento County Department of Airport is soliciting bids for the installation of approximately 12,000 glass rondelles that form the suspended ceiling artwork by artists Huameng Yu and Louis Chinn in the North Pedestrian Walkway at Sacramento International Airport, with bids due November 19, 2026. All field construction and artwork-installation work must be self-performed by the contractor's own employees under Sections 2-5 and 2-8.
The County contracts directly with the installation contractor through the Sacramento County Debt Authority (SCDA). The contractor furnishes labor, supervision, equipment, tools, temporary protection, means-and-method engineering where required, coordination, inspections, documentation, and incidentals. Scope runs from authorized onsite receiving and documented transfer of custody through uncrating, organizing, staging, installation, initial artist review and tuning, adjustments, inspections, correction, cleanup, record documentation, demobilization, and County acceptance.
Opportunity text
Description: The SMF Pedestrian Walkway Riparian Public Art Installation Project consists of installation of approximately 12,000 glass rondelles forming the suspended ceiling artwork by Huameng Yu and Louis Chinn in the North Pedestrian Walkway at Sacramento International Airport. The County contracts directly with the installation Contractor through SCDA. The Contractor shall furnish the labor, supervision, equipment, tools, temporary protection, means-and-method engineering where required, coordination, inspections, documentation, and incidentals necessary for a complete installation. The Contractors Work extends from authorized onsite receiving and documented transfer of custody through uncrating, organizing, staging, installation, initial Artist review and tuning, adjustments, inspections, correction, cleanup, record documentation, demobilization, and County acceptance. All field construction and artwork-installation Work shall be self-performed by the Contractors own employees under Sections 2-5 and 2-8.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-SMF Pedestrian Walkway - Riparian Public Art Installation Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity