Small Structures & Drains Construction - I-64
- The City of Indianapolis Department of Public Works is requesting sealed bids for small structure replacement at 4332 W. 79th Street (LC6942), with bids due June 25, 2026 at 9:30 a.m. and a pre-bid conference on June 9, 2026 at 11:00 a.m. The City applies its MBE/WBE/VBE/DOBE Business Utilization Plan to all bidders and will consider the bidder's affirmative action plan when evaluating responsibility. The scope comprises demolition and removal of an existing culvert on 79th Street within a...
- The City of Indianapolis Department of Public Works is requesting sealed bids for small structure pipe lining, headwall installation, and riprap installation at 8618 W. Log Run Dr., with bids due June 18, 2026 at 9:30 a.m. local time and a pre-bid conference on June 2, 2026 at 2:00 p.m. All bidders are subject to the City of Indianapolis MBE/WBE/VBE/DOBE Business Utilization Plan. The scope encompasses small structure pipe lining, headwall installation, and riprap installation at the specified...
- The Indianapolis Airport Authority is requesting bids on Airport Stormwater Management Facilities - Airport Boulevard Road Repairs (Invitation #C-25-035), with bids due electronically on June 12, 2026 at 1:30 p.m. EDT and a mandatory pre-bid meeting and site tour on May 29, 2026 at 12:00 p.m. at Building No. 280 (Planning and Development Office), 3747 South High School Road, Indianapolis. The scope encompasses water and sewer line construction, highway and street construction, electrical...
- <p>The City of Indianapolis is requesting sealed bids for small structure replacement at 4332 W. 79th Street under CL-02-061, with bids due June 25, 2026.</p> <p>The source provides no additional scope detail, estimated contract value, contract term, set-asides or preferences, evaluation criteria, incumbent information, or procurement timeline beyond the due date. A pre-bid meeting or site visit date is not specified.</p>
- The Oregon Department of Transportation (ODOT) is requesting bids for bridge deck and approach paving on Interstate 84 at two locations in Wasco County under ITB S-73000-00016889, with bids due June 9, 2026 through the OregonBuys system. No pre-bid conference is scheduled. Bidders must be licensed with the State Construction Contractors Board and carry a Public Works bond. ODOT has determined that State Buy America domestic preference requirements under ORS 279C.303 are inapplicable because no...
- The City of Indianapolis Department of Public Works is requesting sealed bids for Phase 2 of the College Ave Resurfacing and Intersection Improvements project, with bids due June 18, 2026 at 9:30 a.m. at the City-County Building, and a pre-bid conference scheduled for June 1, 2026 at 2:00 p.m. in Room 2460. The scope encompasses safety improvements at the intersections of St. Clair Street and Massachusetts Avenue, and resurfacing work on College Avenue from St. Clair Street to 11th Street,...
- The Oregon Department of Transportation is requesting bids on pavement maintenance and traffic control work on Interstate 84 between Troutdale and Corbett under ITB #S-73000-00017026, with bids due June 11, 2026 at 2:00 p.m. and requests for clarification due June 1, 2026 at 5:00 p.m. No pre-bid conference is scheduled. The scope encompasses grind and inlay asphalt paving at multiple locations spanning mileposts 17.7 to 19.4 in Multnomah County: approximately 1,500 feet eastbound at MP...
- The procurement is for the 2026 Indianapolis Local Street Reconstruction Program (ST-26-101), initiated by the state of Indiana and the City of Indianapolis. This project solicits bids for comprehensive local street reconstruction services within Indianapolis, encompassing the planning, design, and execution of street improvement initiatives. While specific deliverables and detailed scope requirements are not fully enumerated in the provided documentation, the program aims to reconstruct and...
- The Illinois Department of Transportation is soliciting electronic bids for wingwall repairs at bridge structure S.N. 092-8600 on FAI Route 74 (I-74) near Kickapoo Pond in Vermilion County, with bids due June 12, 2026 at 12:00 p.m. through the iCX (Integrated Contractors Exchange) system. The project is Contract No. 70H72, Section MBPM 2026-1. The scope comprises two primary work items: installation of helical ground anchors at the North and South wingwalls, and structural steel repairs at...
- The Illinois Department of Transportation (IDOT) is requesting bids on bridge deck repairs, joint replacement, structural steel cleaning and painting, and shoulder work on US 51 over the Illinois Central Railroad (ICRR) north of Central City in Marion County, with electronic bids due June 12, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system. This is a FAP Route 322 project funded under District 8 Construction Funds. The scope includes bridge deck repairs, bridge joint...
The Indiana Department of Transportation (INDOT) is requesting bids for small structures and drains construction on Interstate 64 in Perry County, spanning from 3.04 miles east of State Road 162 to 0.61 mile west of State Road 237, with bids due May 7, 2026 at 10:00 a.m. at the Indiana Government Center North in Indianapolis under Contract No. R-46408-A. A Disadvantaged Business Enterprise (DBE) goal has been established with a minimum percentage of the contract bid price designated for DBE participation. The scope encompasses construction engineering, clearing and right-of-way removal, excavation, pump-around installation, stormwater management and temporary erosion control, cellular concrete fill, compacted aggregate placement, HMA patching, riprap installation with geotextile, seeding and mulching, and pipe installation via trenchless methods for 15-inch, 36-inch, and 42-inch diameters, plus inlet construction, traffic control signage and devices, and pavement markings. The schedule includes 43 line items with specified approximate quantities. Work spans Crawford, Perry, and Spencer counties and must comply with Indiana's 2026 Standard Specifications and Standard Drawings (effective September 1, 2025) and federal Davis-Bacon wage requirements under General Decision IN20250006. Weekly certified payrolls documenting worker classifications, hours, and wages are required. The project completion date is July 1, 2027, with an earliest start date of August 1, 2026. Liquidated damages are assessed at $2,500 per day for failure to meet the completion date. The initial payment for clearing right-of-way is limited to a specified percentage of the original total bid. The consulting firm is Burgess Niple, Inc. (Max Kitten, contact); the INDOT Project Manager is Luke Hill; the Area Engineer is Clint Scherzer. Contractors may submit contract-specific questions through INDOT's online system with responses provided within two business days.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Small Structures _ Drains Construction - I-64.pdf | 4MB | 4/13/26 |