SLN Terminal Public Area Improvements

Closed State & local contract opportunity Posted

Solicitation number
10030091.00
State
Colorado
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Salina Airport Authority is requesting bids for terminal public area improvements at Salina Regional Airport, located at 3237 Arnold Avenue, Salina, Kansas, with bids due October 15, 2026 at 3:00 p.m. CDT.

The scope comprises three primary schedules. Schedule I covers construction of a new TPO roof overlay with tapered insulation to create center-peak drainage at the concourse connector, including new gutters, downspouts, flashing, and relocation of rooftop gas line. Schedule II is a complete interiors refresh of the Terminal Public Lobby, Waiting Area, and Bag Claim, including new lay-in ceiling, lighting, flooring, ticket counters, column covers, monitors, wall treatments, one door replacement with window, and complete restroom renovation with full piping replacement. Schedule III involves replacement of Front Entry and Bag Claim sliding doors. One alternate is offered: Wall Panel Systems (WPS) Universal Architectural System with phenolic-faced panels in lieu of high-pressure laminate (HPL) faced panels, with all other materials, substrates, accessories, and installation requirements remaining as specified unless specifically modified.

Bidding documents are available through QuestCDN for a $22.00 download fee (file size 22 MB); interested parties may view documents at no cost prior to registration. Plan holders are encouraged to register with QuestCDN to receive automatic notice of addenda and bid updates. Woolpert serves as solicitor and project manager. Primary contact is Carla Fischer at 720 S. Colorado Boulevard, Suite 120-S, Glendale, Colorado 80246, telephone 800-414-1045, email Carla.Fischer@woolpert.com. For QuestCDN registration and document access assistance, contact QuestCDN Client Success at 952-233-1632 or Success@QuestCDN.com.

Opportunity text

The work involved will include the following: Schedule I - Construct a new TPO roof overlay with tapered insulation to create a center peak for drainage at the concourse connector area of the terminal. Work includes new gutters, downspouts, flashing and relocation of rooftop gas line. Schedule II - Terminal Public Lobby, Waiting Area and Bag Claim will have a complete interiors refresh including new lay-in ceiling, lighting, flooring, ticket counters, column covers, monitors, wall treatments, one door replacement with a window, and complete restroom renovation. All restroom piping is to be replaced. Schedule III - Replacement of Front Entry and Bag Claim sliding doors. One Alternate is also being requested: ALTERNATE 1: Provide the Wall Panel Systems (WPS) Universal Architectural System with phenolic-faced panels in lieu of the specified high-pressure laminate (HPL) faced panels. Furnish and install phenolic-faced panels matching the indicated colors, patterns, panel sizes, reveals, trims, attachment systems, and performance requirements. All other materials, substrates, accessories, and installation requirements shall remain as specified for the base bid unless specifically modified herein.

Files

File Type Posted
10030091.00.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity