Sewerage System Rehabilitation
Closed State & local contract opportunity Posted
- Solicitation number
- PE-75052-NONST-2026-000000005
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- Point of contact
-
- Mandy Soares msoares@turnipseed.com (706) 863-8800
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Tennille, Georgia is requesting sealed bids for sewerage system rehabilitation funded through a GEFA Overflow and Stormwater Reuse Municipal Grant, with bids due July 30, 2026 at 11:00 a.m. at City Hall. All bidders must hold a State of Georgia Utility Contractor License and employ a state-certified Utility Manager.
The scope includes cleaning and pre-videoing approximately 4,953 linear feet of 8-inch sewer lines; rehabilitation of 4,989 linear feet of 8-inch sewer lines by cured-in-place lining; six point repairs; rehabilitation of ten existing manholes; installation of two new precast concrete manholes; and reconnection of 61 existing service connections and appurtenances. Substantial completion is due within 180 consecutive calendar days, with final completion within 240 days.
A Bid Bond equal to at least 5 percent of the lump sum bid must accompany all proposals. Upon award, the contractor must provide Performance and Payment Bonds each equal to 100 percent of the contract amount. No bid may be withdrawn after closing time for a period of 60 days.
The project is subject to All American Iron and Steel Special Conditions, Davis Bacon, and Build America, Buy America requirements. Plans and specifications are available for inspection at the City of Tennille offices and at Turnipseed Engineers' locations in Atlanta and Augusta, Georgia, or online at https://turnipseed.com/current-projects/out-for-bid/. A digital copy of plans and one printed copy of specifications costs $125.00; one additional printed set of drawings is available at no charge upon request.
Opportunity text
Sewerage System Rehabilitation including clean and pre-video approximately 4,953 linear feet of 8-inch sewer lines, rehabilitation of 4,989 linear feet of 8-inch sewer lines by cured-in-place lining, 6 point repairs, rehabilitation of 10 existing manholes, installation of 2 new precast concrete manholes, reconnection of 61 existing service connections and appurtenances. Time allotted for this work is 180 consecutive calendar days for substantial completion and 240 days for final completion.
Files
| File | Type | Posted |
|---|---|---|
| Ad for Bid _ Sewerage System Rehabilition.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity