Sewerage system improvements 152025
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66633-NONST-2026-000000002
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 40151718 Sludge pump spare parts
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 40151517 Sewage pumps
- 72141124 Pipe laying service
- 95121640 Pipeline
- 72141111 Gas main construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
- 40151525 Sludge pumps
Show all 18
- Point of contact
-
- Stephanie Jones sjones@turnidseed.com (706) 863-8800
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
This is a sealed bid procurement by the City of Danielsville, Georgia for Sewerage System Improvements (Project 152025) located in Laurens County. The project encompasses two divisions: Division I requires installation of approximately 7,700 linear feet of 8-inch gravity sanitary sewer and approximately 10,400 linear feet of 6-inch force main with all necessary appurtenances; Division II involves installation of one new sewage pump station featuring a precast wet well, pumps, electrical systems, piping, and site work, along with replacement of pumps, piping, and control panels in an existing pump station. Sealed bids must be received by February 26, 2026 at 2:00 p.m. local time at City Hall, 10 Government Circle, Danielsville, Georgia 30633, with public opening and reading of bids to follow immediately thereafter. Bidders must possess a Georgia Utility Contractors License and employ a state-certified Utility Manager to oversee all work. Construction must achieve substantial completion within 450 consecutive calendar days and final completion within 480 consecutive calendar days, with no bid withdrawals permitted for 90 days following the bid closing deadline. Bids shall be submitted on a lump sum and unit price basis with additive alternate bid items as specified in the Bid Form. Bidding documents are available from Turnipseed Engineers (4210 Columbia Road, Building 3, Augusta, Georgia 30907; contact Jillian Fritz at 706-863-8800) for a $300.00 deposit for full sets of drawings and specifications, plus an additional $150.00 for reduced-sized drawings, with one-half refund available for documents returned in good condition within 30 days of bid opening.
No specific set-aside designations or restrictions limiting bidder eligibility are identified in the procurement documentation. All iron and steel products utilized on this project must comply with American Iron and Steel requirements mandated by Section 746 of Title VII of the Consolidated Appropriations Act of 2017, requiring that all listed iron and steel products be produced in the United States, with de minimis and minor components waivers applicable. No incumbent vendors or current contractors are identified in the available documentation. The procurement does not specify an estimated award value or budget range in the provided materials; interested bidders should contact the Issuing Office for additional project cost information and detailed specifications.
Opportunity text
Sealed Bids for the construction of the Sewerage System Improvements, December 2025 will be received, by CITY OF DANIELSVILLE, at City Hall, 10 Government Circle, Danielsville, Georgia 30633, until 2:00 p.m. local time on February 26, 2026, at which time the Bids received will be publicly opened and read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Project consists of construction of: Division I: Installation of approximately 7,700 linear feet of 8" gravity sanitary sewer, and approximately 10,400 linear feet of 6" force main complete with all appurtenances. Division II: Installation of one sewage pump stations including precast wet well, pumps, electrical, piping, site work and all appurtenances as well as replacement of pumps, piping control panel in an existing pump station. Time of construction is 450 consecutive calendar days for substantial completion and 480 consecutive calendar days for final completion.
Files
| File | Type | Posted |
|---|---|---|