San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation
Open State & local contract opportunity Posted
- Solicitation number
- 26-NIIB-052
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Contra Costa County is soliciting bids for the San Pablo Dam Road 24" ACP-CIPP Trunk Line Rehabilitation, with bids due November 13, 2026. The notice was posted November 3, 2026.
The scope is installing approximately 420 linear feet of 24-inch cured-in-place pipe (CIPP) liner inside the existing 24-inch asbestos cement (ACP) trunk sewer on San Pablo Dam Road, from manhole MHM17105 to manhole MHM17106. The contractor must furnish all materials, equipment, and labor and must provide traffic control, temporary bypass or pumping, post-installation CCTV inspection video, and acquisition of required permits. Permit requirements are detailed in a technical specifications section referenced in the notice.
Installation work must occur at night, when traffic and sewage flows are below average as determined by WCW. The entire project must be completed within 30 calendar days of Notice to Proceed (NTP).
Opportunity text
The following scope of work is required to complete the San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation Project: Provide all materials, equipment, and labor necessary to: Install approximately 420 LF of 24 CIPP Liner in the 24 ACP trunk sewer on San Pablo Dam Road from MHM17105 to MHM17106 Provide Traffic control Temporary Bypass/pumping CCTV post-installation inspection video Acquire Required Permits (see technical specifications section) Complete construction installation work during night time when traffic and sewage flows are below average as determined by WCW Complete project within 30 Calendar days of NTP
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity