The City of Siloam Springs, Arkansas is soliciting sealed bids for the Sager Creek Improvement project, a multi-component water infrastructure rehabilitation effort, with bids due July 2, 2026 at 2:00 p.m. Prequalification submissions were due June 2, 2026; a mandatory pre-bid conference and site tour is scheduled for June 11, 2026 at 10:30 a.m. at Twin Springs Gazebo in Siloam Springs.

The prime contractor must be licensed as a general contractor in Arkansas and must have completed a prequalification form demonstrating similar project experience, with at least two of four required projects completed by the prime contractor. This is a low-bid award to the lowest responsible offeror.

The scope spans seven major components: installation of cofferdams and water-diversion measures; stabilization of a rock overhang with shotcrete and passive rock anchors; replacement of two sluice gates on a masonry dam; fabrication and installation of steel debris impact deflection; dam crest repair with shotcrete and reinforcement; rehabilitation of the Twin Springs landing structure and adjacent park elements; and stabilization of disturbed areas through topsoil and grass installation. The work includes 34 line items with unit-price components encompassing sedimentation controls, shotcrete applications, 50 passive rock anchors, selective demolition, concrete and masonry work, stone elements, and electrical improvements.

Bid security is five percent of the proposed contract price, acceptable as a bid bond, irrevocable letter of credit, cashier's check, or certified check payable to the City of Siloam Springs. The successful contractor must provide performance, payment, and maintenance bonds within fifteen days of notice of award. Substantial completion is required within 180 calendar days after work commencement, with final completion within 30 days thereafter. Liquidated damages are $1,500 per day for delays. A one-year correction period and one-year maintenance bond are required following substantial completion. Questions are due by 12:00 p.m. on June 18, 2026, with responses provided by 12:00 p.m. on June 29, 2026.

Opportunity text

The Project includes the following major components: 1. Installation of Care of Water measures (cofferdams, diversions, etc.) as necessary toprotect the Work and facilitate construction. 2. Stabilization of a rock overhang with shotcrete and passive rock anchors. 3. Replacement of two sluice gates on the masonry dam. 4. Fabrication and installation of steel debris impact deflection. 5. Repair of the dam crest with shotcrete and reinforcement. 6. Rehabilitation of the Twin Springs landing structure and adjacent park elements asdetailed on the Construction Drawings. 7. Stabilization by topsoil and grass of all areas disturbed by construction activities.

Files

File Type Posted
Specs to Bid - Sager Creek Improvements.pdf PDF