Sable palm safe route to school sidewalks
Closed State & local contract opportunity Posted
- Solicitation number
- IFB-100-25-RM
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91227 Construction, Irrigation System
- 91339 Construction, Pipe Culvert
- 91345 Construction, Sewer And Storm Drain
- 91358 Construction, Viaduct (Includes Reconstruction)
- 91371 Maintenance And Repair, Highway And Road (To Include The Removal Of Asphalt, Concrete, Bitumens, Etc)
- 91381 Maintenance And Repair, Sewer And Storm Drain (Including Removal)
- 91390 Maintenance And Repair, Viaduct
- 98863 Park Area Construction/Renovation
- UNSPSC codes
- 72141511 Digging services
- 95121516 Artificial rock and rockwall
- 72141123 Manhole construction service
- 72141129 Park and garden construction and or remodelling service
- 95121515 Artificial water fall
- 95121508 Childrens play area or playground
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 70171710 Irrigation system construction service
- 95121630 Underpass
Show all 23
- 95121629 Railway viaduct
- 95121511 Park
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 72141109 Viaduct construction and repair service
- 95121628 Road viaduct
- 95121631 Overpass
- 72141003 Highway and road maintenance service
- 73151502 Joint sealing services
Opportunity details come from talgov.bonfirehub.com. Updated .
About this opportunity
The City of Tallahassee and Leon County, Florida are soliciting competitive bids for the Sabal Palm Safe Routes to School Sidewalks Project through an Invitation for Bid (IFB 100-25-RM). The procurement seeks a contractor to provide comprehensive infrastructure improvements, including removal of existing storm pipes, headwalls, curb and gutter, fencing, trees, and pavement markings, and installation of new sidewalks along Villamore Avenue, Dale Street, and Ridgeway Street. Key project deliverables include drainage improvements at Eisenhower Street and Villamore Avenue, ADA accessibility enhancements at driveway connections to Sabal Palm Elementary, and landscaping and irrigation work. A mandatory pre-bid meeting is scheduled for October 28, 2025, at 2:00 PM EST via Microsoft Teams, with bids due on November 20, 2025. Contractor qualifications include capabilities to perform arboricultural mitigation, secure necessary road closures, submit acceptable Temporary Traffic Control plans, and complete the 140 calendar day project within specified technical requirements.
The project includes a Disadvantaged Business Enterprise (DBE) program goal of 10.54%, indicating opportunities for small and minority-owned businesses. Bidders must provide a 5% bid security and performance bond covering 100% of the contract price, demonstrate compliance with E-Verify requirements, and maintain a drug-free workplace. Insurance requirements include $3,000,000 in general liability coverage. The project will be funded through federal-aid mechanisms and must adhere to Buy America provisions and Florida Department of Transportation standards. Liquidated damages are set at $1,685 per calendar day for delays beyond the contract timeframe. While a specific contract value is not explicitly stated, the comprehensive scope of infrastructure improvements suggests a substantial investment in local transportation and accessibility infrastructure, with anticipated project completion and Commission approval expected in late 2025 or early 2026.
Opportunity text
SCOPE OF WORK Sabal Palm Safe Routes to School Sidewalks Project - The Contractor will provide labor, materials, equipment, supplies, services, skills, supervision and necessary tools and equipment, throughout the Contract period, in accordance with the provided plans and specifications. Construction includes but is not limited to: • Removal and disposal of existing storm pipes, headwalls, curb and gutter, fencing, trees, miscellaneous concrete, asphalt paving, and pavement markings. • Installation of new sidewalks along Villamore Avenue, Dale Street, and Ridgeway Street. • Drainage Improvements at Eisenhower Street and Villamore Avenue. • ADA improvements at the existing driveway connections to Sabal Palm Elementary on Ridgeway Street, Eisenhower Street and at the intersection of Ridgeway Street and Eisenhower Street. • Landscaping and irrigation as shown on the plans. This projects also include other items incidental to the infrastructure replacement, such as: disposal of materials removed; sediment and erosion control, maintenance of traffic, and restoration of disturbed areas as identified in the Contract Documents. Specifically, the contractor will be required to provide arboricultural mitigation for trees impacted, per the provided Arborist Report and plan sheets and to secure road and/or lane closure requests after submission of acceptable Temporary Traffic Control plans. The Contractor shall have the capability to perform and complete the services in all respects in accordance with the solicitation documents. MANDATORY PRE-BID MEETING: OCTOBER 28 2025 @ 2:00 PM (EST) ON MICROSOFT TEAMS (SEE BELOW) Microsoft Teams Need help? ________________________________________ Microsoft Teams Need help? Join the meeting now Meeting ID: 230 537 436 838 0 Passcode: Zf32oM3T Join on a video conferencing device Tenant key: talgov@m.webex.com Video ID: 117 998 854 6