S. 3rd Street Parking Lot NEVI RFP
Closed State & local contract opportunity Posted
- Solicitation number
- US.254659
- State
- Pennsylvania
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
Opportunity details come from pennbid.bonfirehub.com. Updated .
About this opportunity
The City of Easton, Pennsylvania, through its Department of Public Works, is soliciting a project partner through a PennBid RFP to develop a DC fast-charging station at the South Third Street Parking Lot, with proposals due October 27, 2026 at 1:00 p.m. Both the October 8, 2026 question deadline and the proposal deadline have passed as of today. The source names no set-aside, preference, or local-vendor requirement.
The partner will design, permit, install, own, operate, and maintain four NEVI-compliant DC fast chargers at the 20-space public lot between Pine and Ferry Streets. Required work includes NEPA environmental documentation, utility coordination, electrical design, surveying, permitting, constructability review, contract management, and NEVI compliance reporting. Chargers must maintain the NEVI-required 97% uptime per charging port. If utility power is insufficient, the City will also evaluate four NEVI-compliant Level 2 chargers as an alternative.
The contract requires a minimum of five years of operation and maintenance. The City anticipates no municipal funds, so the partner must supply all matching funds and cover all project costs not covered by NEVI Community Charging Funding Opportunity awards through PennDOT's East Region. In exchange for site use, the partner will provide either a revenue share of gross charging revenues or a lot-use fee. The source states no dollar value. Any contract requires City Council approval and takes effect only upon that approval.
Proposals will be evaluated on technical expertise and experience, compliance with NEVI standards, community charging power level, equipment quality, equipment uptime capabilities, and proposed procedures and methods. Each submission must include a Letter of Transmittal, a firm profile with references, a work procedures explanation, a project schedule, a Nondiscrimination/Sexual Harassment Certification Form, and a Non-Collusion Affidavit. Submissions remain effective for 120 days from the deadline.
Opportunity text
The City of Easton is seeking a project partner to develop an electric vehicle charging station at the South Third Street Parking Lot in downtown Easton. The selected partner will design, permit, install, own, operate, and maintain four NEVI-compliant DC fast chargers. The partner will be responsible for all required matching funds and project costs not covered by NEVI funding, with no City funds anticipated for the project. The selected partner will also provide either a revenue share from charging operations or a fee for use of the parking lot. The work includes NEPA/environmental documentation, utility coordination, electrical design, surveying, permitting, NEVI compliance, constructability review, contract management, and required reporting. Respondents must submit a work approach, schedule, references, required certifications, non-collusion affidavit, and nondiscrimination/sexual harassment certification through PennBid.
Files
| File | Type | Posted |
|---|---|---|
| 1-S. 3rd St NEVI.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity