Rosemont Street Extension

Awarded State & local contract opportunity Posted

Solicitation number
22-0308
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Richmond Hill is requesting sealed bids for the Rosemont Street Extension, a road construction project, with bids due March 8, 2022 at 11:00 a.m. Eastern Time. A non-mandatory pre-bid meeting is scheduled for February 8, 2022 at 11:00 a.m. at City Hall, 40 Richard R. Davis Drive, Richmond Hill, Georgia.

The scope involves extending Rosemont Street approximately 300 linear feet with installation of erosion, sedimentation, and pollution-control best management practices; demolition and replacement of unsuitable subbase material; roadway and ditch grading; permanent grassing; drainage system installation including ditches, reinforced concrete pipe, and rip rap; 12-inch PVC installation with tie-in; six-inch-deep GAB road base; 1.5-inch asphalt concrete surface per GDOT 12.5 mm superpave specifications; construction of 14-foot-wide asphaltic driveways; survey and as-built documentation; and all testing required to comply with GDOT and City specifications.

The source does not identify a contract value, incumbent contractor, evaluation criteria, or question deadline.

Opportunity text

Sealed BIDS will be received by the City of Richmond Hill at the office of the Purchasing Agent until 11.00am (Eastern Time) on Tuesday, March 8th, 2022 and then at said office publicly opened and read aloud. The Work to be bid consists of furnishing all materials, labor and equipment for the Construction of: Rosemont Street Extension The Work is generally described as follows: Extend Rosemont Street approximately 300 LF which includes 1- Installation of BMP (Erosion, Sedimentation and Pollution Control Best Management Practices), 2- Demolition, removing and replacing of unsuitable subbase material. 3- Grading of roadway and ditches. 4- Installation of permanent grassing. 5- Installation of drainage system which includes ditches, miscellaneous reinforced concrete pipe (RCP) and rip rap. 6- Installation of 12 inch PVC and tie-in. 7- installation of 6" deep GAB road base and 1.5" asphalt concrete GDOT 12.5 mm superpave surface. 8- Construction of 14' wide 12.5 mm asphaltic driveways. 9- Survey and as-built. 10- All testing needed for this type of work to comply with all GDOT and City Specifications. A NON-MANDATORY PRE-BID MEETING has been scheduled for 11.00am (Eastern Time) on Tuesday, February 8th, 2022 and will be conducted at the CITY OF RICHMOND HILL 40 RICHARD R. DAVIS DRIVE RICHMOND HILL, GEORGIA 31324, to discuss the specifications and resolve any questions and/or misunderstanding that may arise.

Files

File Type Posted
Award Information —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity