About this opportunity
The City of Frederick, Maryland is soliciting bids through Invitation for Bid IFB-27-17 for construction of the Rosemont Avenue/Baughman's Lane intersection improvements, with a non-mandatory pre-bid meeting on November 19, 2026 at 1:00 p.m. via Microsoft Teams and responses due December 30, 2026 at 3:00 p.m. The City has established M/WBE participation goals of 36 percent for Minority-Owned Businesses and 11 percent for Women-Owned Businesses, and bidders must either meet these goals or document good faith efforts to achieve them. A local preference of 10 percent of the lowest quote, not to exceed $100,000, is available to City Businesses, though the solicitation file flags that federal or state grant restrictions may prohibit that preference.
The project realigns a five-legged intersection into a four-legged configuration by shifting Baughman's Lane west approximately 75 feet. It includes roughly 275 feet of four-lane roadway with a bus stop and a shared use path of approximately 1,500 feet on the north side of Baughman's Lane, from Rosemont Avenue to Shookstown Road. Work covers excavation and embankment, bituminous and Portland cement concrete pavement, mill and overlay, curb and gutter, storm drainage and stormwater management facilities, sidewalks, landscaping, maintenance of traffic, sediment control, street lighting, traffic signal installation with removal of the existing signal, and tree plantings. The bid form contains 147 line items and seven contingency items.
Bidders must submit evidence of a permanent business location, technical knowledge and experience, organization and manpower, adequate financial status, and no pending claims. Required bonds are a 5 percent bid bond, 100 percent performance and labor and materialmen's bonds, and a two-year maintenance bond before final acceptance. Insurance requirements include a $2,000,000 general liability aggregate, $2,000,000 commercial umbrella per occurrence, and builder's risk at 100 percent of project value.
The maximum budget is $2.5 million, with completion required within 540 days of Notice to Proceed. Award goes to the lowest responsive and responsible bidder. Prices are fixed and firm for the contract term, payment is monthly based on work performed with 5 percent retainage, and liquidated damages are $400 per calendar day beyond the Substantial Completion date. Listed jurisdictions are Frederick County, Maryland and the Forestville CDP. A non-mandatory site visit at the intersection will be held on a date to be determined.
Opportunity text
2 versions
Update #2 · Latest ·
The purpose of this Invitation to Bid is to identify and award a source of supply, through a single solicitation, for the construction of the Rosemont Avenue, Military Road and Baughman's Lane Intersection Re-alignment for the City of Frederick. This project includes realignment of an existing intersection from a 5-legged intersection to 4-legged. The south leg of the intersection (Baughmans Lane) will be realigned to the west approximately 75-ft from existing centerline, eliminating the offset between Military Road and Baughmans Lane. Improvement length is approximately 275-ft long, not including the shared use path, and will include four-lanes, and a bus stop, starting at the intersection and tapering down to the existing section just short of Baughmans Lane Bridge. A shared use path will be added on the north side of Baughmans Lane, from Rosemont Avenue to Shookstown Road, approximately 1,500 feet. The project will include, but is not limited to, roadway excavation/embankment, bituminous concrete pavement, mill and overlay, concrete curb and gutter, storm drainage system, stormwater management facilities, bituminous and portland cement concrete sidewalks and shared use path, landscaping, maintenance of traffic, fine grading and sediment control, installation of street lights, installation of a traffic signal and removal of old signal, tree plantings, and miscellaneous site work.
Update #1 ·
The Contractor shall furnish all labor, supervision, project management, estimating, engineering or design services when expressly included, materials, equipment, tools, transportation, permits, temporary measures, testing, safety controls, protection, cleanup, closeout, and incidentals necessary to complete each authorized Job Order. The on-call services contract will result in approximately 40 to 50 projects throughout a one-year term. CA offers no guarantee as to the number of projects or the total value of projects (per project or in the aggregate) that will be offered or awarded.
Files
| File | Type | Posted |
|---|---|---|
| 854632hardscapeCollAss.pdf | ||
| 854503laneFred.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity