The Seminole Tribe of Florida's Housing Department is soliciting bids under ITB-LD 186-2026 for roof replacement at the Hollywood Reservation in Plantation, Florida, with a mandatory pre-bid conference on November 16, 2026 at 9:00 a.m. and bids due November 30, 2026 at 5:00 p.m. A bid preference applies to qualified Seminole Tribal Member-owned and STOFI-owned businesses whose bids fall within 4% (not to exceed $200,000) of the lowest non-Tribal Member business bid.

Scope covers removing existing gutters, roof tiles, underlayment, metal drip edges, and solar panels for reinstallation. Contractors install either a metal standing seam roof or 30-year GAF Timberline architectural shingles on the sloped area, and a modified bitumen system on the flat roof. Accessible flashing is replaced with color-coated aluminum. Work must comply with Miami-Dade standards and Florida Building Code, with permits and inspections handled through the Tribal Building Department. Sheathing and fascia repairs are limited to up to eight sheets of plywood and up to 160 linear feet of wood fascia, required only if water damage is found during demolition.

Respondents must hold current state or county roofing, general contractor, building contractor, or residential contractor licenses and have at least three years in business. Required insurance includes commercial general liability of $1.0 million per occurrence and $2.0 million aggregate, automobile liability of $1.0 million, and workers' compensation as required by law. Certificates naming the Seminole Tribe of Florida as additional insured are due before work begins. Attendees at the pre-bid conference at 7441 NW 11 CT, Plantation, must bring their own thirty-foot ladder to access the roof.

Work must start within 28 calendar days of the purchase order and finish within 30 calendar days. Prices must remain fixed for at least 180 calendar days from the bid due date. Questions are due November 19, 2026 at 5:00 p.m., and bids are submitted via BidNet Direct.

Evaluation prioritizes on-time and complete submissions, licensing, projected completion dates, past performance, qualifications, current workload capacity, and price versus market comparison. The Tribe reserves the right to reject any or all bids and to award to one or multiple respondents.

Opportunity text

1.1. ROOF REPLACEMENT: Remove existing rain gutters and downspouts and responsibly dispose. Rain gutters are not being replaced at this time. Remove existing roof tiles and underlayment and responsibly dispose. Remove existing modified in rear flat roof area and responsibly dispose. Remove existing metal drip edges and responsibly dispose. Inspect all existing sheathing and facias for possible damage. o If damage is found, CONTRACTOR must stop work until contact is made with the TRIBEs Project Manager to receive directions. o Pictures of damaged area must be taken. Install aluminum drip edge along all edges, eaves, and rakes per residential building code. Install leak barrier(s) at all eaves, valleys, and around penetrations. RE-ROOF - SLOPED ROOF AREA: Option #1 - Install new metal standing seam roof with mill finish, install new peel & stick underlayment (to code). Provide & install up to eight (8) sheets of plywood decking if water damage is discovered during demolition (to include sloped & flat area of roof). Provide & install up to one hundred and sixty (160) linear feet of wood fascia if water damage is discovered during demolition (like for like). Option #2 - Install thirty (30) year GAF Timberline Architectural roof shingles (Color to be determined) using one and a quarter inch (1) hot dipped coil nails penetrating at nail zone. Provide & install up to eight (8) sheets of plywood decking if water damage is discovered during demolition (to include sloped & flat area of roof). Provide & install up to one hundred and sixty (160) linear feet of wood fascia if water damage is discovered during demolition (like for like). RE-ROOF FLAT ROOF AREA: First Ply: Install base sheet underlayment mechanically attached (as per manufacturers specifications). Second Ply: Install a modified bitumen system as per manufacturers specifications). All to be code approved with proper NOAs. Replace all flashing that can be accessed without damaging siding materials, including counter, step, and apron flashing with new color coated aluminum. o Step flashing must be four inches (4). o Any flashing fastened to masonry must be cut into masonry. o Seal all exposed nail heads and transitions. Install and seal pipe collars. Install ridge cap shingles over all hips and ridges using two-inch (2) nails. SOLAR PANELS: Remove & store for re-installation existing solar panels. If a metal standing seam roof is installed provide S-5-N 1.5 clamps for re-installation of solar panels on the metal roof. o Note: Clamp specs are provided for clarity. If roof shingles are installed use Iron Ridge L-Mount solar brackets. Properly flash and waterproof all brackets (as necessary).

Files

File Type Posted
seminole ITB-LD 186-2026.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors