- The Pennsylvania Department of Transportation (PennDOT) is soliciting bids for bridge replacement and miscellaneous construction on State Route 2002, Section 022, in York County, York Township, with bids due August 13, 2026. Prequalification is required for bidding. The project carries a 0 percent Disadvantaged Business Enterprise (DBE) goal and is subject to prevailing wage rates, the Build America, Buy America Act (requiring domestically produced iron, steel, and manufactured products), and...
- Pennsylvania Department of Transportation (PennDOT) is seeking bids on the replacement of the T-719 (Schoolhouse Road) bridge over Brush Creek in Northampton Township, Somerset County, with bids due August 27, 2026 and public opening at 11:00 a.m. at the Commonwealth Keystone Building in Harrisburg. Prequalification is required for all bidders. The project is federally funded under the Bipartisan Infrastructure Law, triggering Buy America and Build America compliance, including restrictions on...
- The Pennsylvania Department of Transportation is soliciting sealed bids for bridge replacement and roadway reconstruction on SR 4027 over a tributary to Bald Eagle Creek and T-527 over Vansoyoc Run in Snyder Township, Blair County, with bids due August 27, 2026 at 11:00 a.m. Prequalification is required. Federal funding carries Buy America provisions and DBE requirements. The scope includes replacement of two bridge structures, roadway reconstruction along State Routes 4027/4033 (Sections...
- The Pennsylvania Department of Transportation (PennDOT) is soliciting sealed bids for bridge preservation work on State Route 0072, Section 067 in Lebanon County, Union Township, with bids due August 27, 2026 at 11:00 AM. This is a federally-funded project subject to Buy America, Build America, and Executive Order 11246 compliance; DBE participation is set at 0 percent. Contractor prequalification is required. The scope encompasses concrete repairs to an arch culvert barrel, concrete cutoff...
- The Pennsylvania Department of Transportation is soliciting bids for bridge replacement and culvert construction on State Route 120 in Clinton County, with bids due August 13, 2026 at 11:00 a.m. Prequalification is required. This is a 100 percent state-funded project subject to Pennsylvania's Prevailing Wage Act and prevailing wage rates. The scope encompasses removal of an existing bridge over Dry Run and construction of a cast-in-place reinforced concrete box culvert, including asphalt...
- Pennsylvania Department of Transportation (PennDOT) is soliciting bids for replacement of Chartiers Creek Bridge #64 (Gabby Bridge) carrying Ridgewood Drive over Chartiers Creek in North Franklin Township, Washington County, with bids due August 13, 2026. Prequalification is required; no pre-bid meeting is scheduled. The project is federally funded and carries a 0% DBE requirement. The scope encompasses full bridge replacement from Station 11+15 to Station 15+50, including approach roadway...
- Pennsylvania Department of Transportation is soliciting bids for replacement of the US 322 bridge over Campbell Run in Jefferson County, Rose Township, with bids due August 27, 2026. The project scope includes demolition of the existing concrete slab bridge and construction of a new precast reinforced concrete box culvert carrying US 322 over Campbell Run, along with associated miscellaneous construction work extending from approximately 250 feet before the existing structure to approximately...
- The Pennsylvania Department of Transportation is requesting bids for culvert replacements and miscellaneous construction on State Routes 143, 1015, and 4014 across Lynn Township and Moore Township in Lehigh and Northampton Counties, with bids due August 13, 2026. The project is 100% state-funded (non-federal) and subject to Diverse Business requirements for non-federally funded projects; prequalification is required. The scope includes clearing, grubbing, excavation, asphalt paving, drainage...
- Pennsylvania Department of Transportation (PennDOT) District 04 is soliciting bids on resurfacing approximately 12.3 miles of existing roadway across various municipalities in Wayne County, Pennsylvania, under Project 121610, with bids due August 13, 2026 at 11:00 a.m. at the Commonwealth Keystone Building, Harrisburg. Prequalification is required. The project is 100% state-funded and subject to prevailing wage rates. Scope includes asphalt binder course overlay, milling, base repair, line...
- The Pennsylvania Department of Transportation (PennDOT) is soliciting bids for reconstruction of State Route 80 Section 131 and State Route 487 Section 103 in Columbia County, spanning 4.986 miles, with bids due August 27, 2026 at 11:00 a.m. Federal oversight and wage-rate requirements apply; no DBE set-aside is required. The scope encompasses milling and overlay with Superpave Asphalt Mixture WMA wearing and scratch courses and Stone Matrix Asphalt Mixture WMA wearing course RPS; pavement...
The Pennsylvania Department of Transportation (PennDOT) is requesting sealed bids for the replacement of the bridge carrying State Route 3002 over Rock Creek in Adams County, with the letting (bid opening) scheduled for August 27, 2026 at 11:00 AM. The project requires prequalification; no pre-bid meeting is scheduled. The scope involves demolition of the existing four-span non-composite steel stringer beam bridge and reconstruction as a two-span bulb-T beam structure with reinforced abutments. Work spans 1,535 linear feet (0.29 mile) across Mount Joy and Cumberland Townships from Segment 0060 Offset 0653 to Segment 0070 Offset 0728. Construction items include clearing and grubbing, excavation, bridge removal and reconstruction, temporary causeway installation, traffic control and maintenance, seeding and erosion control measures, and miscellaneous site work. The project is classified as non-National Highway System (NHS) with 78% structure work. Detailed material certification through ECMS, concrete and asphalt quality testing with ride-quality incentive payments, stormwater management and NPDES permit compliance, and coordination with adjacent property owners including maintaining access to Parcel 2 (Mary Penn Bed & Breakfast) are required. Liquidated damages provisions apply to road user impacts and temporary traffic restrictions. The estimated project cost is $5,000,000 to $7,499,999.99. The anticipated Notice to Proceed is October 13, 2026, with a required completion date of December 1, 2027. A 0% DBE requirement applies. Wage rates are applicable. The project is federally funded and subject to Buy America requirements, Build America Buy America Act provisions, Executive Order 11246, environmental and erosion control regulations, right-to-know law compliance, and unmanned aircraft system prohibitions.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
836141padot99832.pdf | 1MB | 8/3/26 |