RMD3208002 - Rosewood - 139th Street, et al. Phase II
Closed State & local contract opportunity Posted
- Solicitation number
- RMD3208002
- State
- California
- Responses due
Opportunity facts
Opportunity details come from dpw.lacounty.gov. Updated .
About this opportunity
The California Department of Transportation (Caltrans) is soliciting sealed bids for the Rosewood – 139th Street, et al. Phase II pavement rehabilitation project (RMD3208002), with bids due September 29, 2026.
The work scope encompasses cold-milling existing pavement to produce cold central plant recycled asphalt (CCPR); pulverizing and stabilizing remaining existing pavement with underlying base material and/or soil to create cement-stabilized pulverized base (CSPB); and placing a layer of rubberized hot-mix asphalt over the CCPR and CSPB to provide a finished driving surface. The project design integrates recycled materials and stabilization techniques to extend pavement life while maintaining structural integrity.
The contract will be awarded to the lowest responsive and responsible bidder. Bid documents include detailed pricing terms, specifications, and contract conditions that all bidders must review and comply with in their submissions. The Special Provisions document establishes technical requirements, materials specifications, construction standards, performance criteria, material sourcing and certification requirements, compaction and density specifications for the CSPB layer, rubberized asphalt mix design and placement standards, and environmental compliance measures. The Instructions to Bidders document outlines procedural requirements, bid submission instructions, and requirements for bid bonds, insurance, contractor qualifications, and compliance with applicable laws and regulations.
Interested bidders are invited to attend a pre-bid meeting or conduct site visits to familiarize themselves with project conditions and requirements. The Plans document provides the technical specifications and engineering details necessary for bidders to understand the scope and requirements of the Phase II rehabilitation work. No specific contract value, set-asides, preferences, or contract duration are identified in the available source material.
Opportunity text
Proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface.
Files
| File | Type | Posted |
|---|---|---|
| Notice Inviting Bids.PDF | ||
| Instructions To Bidders.PDF | ||
| Plans (as advertised).PDF | ||
| Special Provisions.PDF |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity