About this opportunity
The City of Flagstaff, Arizona is requesting Statements of Qualifications for Construction Manager at Risk (CMAR) services on the Fanning Wash Diversion Project, with SOQs due September 18, 2026 at 12:00 p.m. and questions due by September 9, 2026. Selection is qualifications-based under A.R.S. 34-603, and the contractor must self-perform at least 45% of the work per Arizona Revised Statutes 34-605(G)(2).
The project involves approximately 3,000 linear feet of new 72-inch storm drain infrastructure along E. Linda Vista Drive in east Flagstaff, designed to reduce flooding risks to nearby neighborhoods and Thomas Elementary School. The scope includes a new diversion inlet and outlet structure, storm drain conveyance improvements, potential channel modifications, localized roadway impacts, and utility coordination. The CMAR contractor will provide two-phase services: a Design Phase during which it reviews construction documents at 60%, 90%, and 100% completion stages, develops cost models, and prepares Guaranteed Maximum Price (GMP) proposals; and a Construction Phase performing the actual construction work.
The initial project budget is approximately $4.5 million. The project is currently at 60% design completion, with final design anticipated in Season 2026/2027 and construction completion targeted for Season 2028. City Council design-phase approval is anticipated in October/November 2026, GMP approval in April 2027, and notice to proceed for construction in April 2027.
Evaluation is weighted as follows: Contractor Overview and Personnel (10 points), Project Experience (30 points), Project Team (20 points), Project Approach (20 points), Project Management (10 points), and Added Value Knowledge and Experience (10 points). Up to five contractors may be invited for interviews at the City's discretion. The City will negotiate separately with the highest-ranked contractor for both the Design Phase Services Agreement and the Construction Phase Services Agreement. Submissions must be made electronically through OpenGov at https://procurement.opengov.com/portal/flagstaffaz; hard copies are not accepted.
Opportunity text
- CMAR Design Phase Services by the Contractor generally include coordination with a Design Professional to review the construction documents, review and provide input on design, quantities, plans, schedules, constructability, and subsurface utility investigations. Additionally, the Contractor will develop a Project master schedule, cost models, and GMPs for the Project. The anticipated services include but are not limited to the following: Generate a detailed Scope of Services and Fees for the Design Phase of the Project to be agreed upon by the Owner. Participate in a project kick-off meeting with City Staff and Project Stakeholders. Develop and continually update the Project Master Schedule Prepare and update a Construction Management Plan if agreed on by the City, the Contractor, and the Design Professional to be necessary. Attending a design review meetings with the Design Professional, Owners Project Manager, and other City departments as necessary. Review construction documents and provide input, to be included in the Owners comment response form, at the 60%, 90%, and 100% stages of the design development. Input should include:Quantities, Constructability, value engineering, procurement time requirements, installation strategies, construction factors such as estimated cost of alternative designs, materials, and budgets. Means and method recommendations to facilitate construction (e.g. scheduling of long lead time procurements, minimizing disruptions to plant operations, etc.).
- Within the context of available budget develop accurate and detailed Cost Models of the 60% and 90% construction documents by applying knowledge of current marketplace conditions. Each Cost Model submitted shall be accompanied by backup documentation which shall include, but not be limited to the following:
Unit prices and quantity take-offs. Details of all allowances and unit price work shown and specified in the detailed design documents. Include a list of all assumptions and description and breakdown of all allowances. Material costs, equipment costs, labor costs, General Conditions costs, hourly labor rates, and total cost. Copies of quotations from subcontractors and suppliers. Portion of the work to be performed by subcontractors including subcontractors overhead and profit. Production rates, transportation, and other facilities and services necessary for the proper execution of the work, whether temporary or permanent, and whether incorporated or to be incorporated into the work. All fixed equipment, site improvements, utility, and equipment installations. Allocated general and administrative expenses. Project overhead. The CMARs profit. Bonds, taxes, and insurance. Memoranda, narratives, reports, and all other information included by the CMAR. Cost Models will be utilized as the basis of the GMP Proposal. Cost Models will be compared with the estimate prepared by the Design Professionals and the City.
Files
| File | Type | Posted |
|---|---|---|
| Fanning_Wash_Diversion_Project_-_Construction_Manager_at_Risk.pdf |