RFQ Refurbish Lift Station, FCI Cumberland
Closed State & local contract opportunity Posted
- Solicitation number
- 15B10727Q00000015
- State
- Maryland
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Federal Bureau of Prisons (FCI Cumberland) in Cumberland, Maryland is requesting proposals to refurbish a wastewater lift station under RFQ 15B10727Q00000015, with offers due September 25, 2026 at 10:00 a.m. Eastern Time. The solicitation is unrestricted and open to all qualified contractors.
The scope encompasses demolition and removal of existing pumps, grinder, auger, electrical disconnects, transfer switch, and controls; installation of new lift station equipment; electrical upgrades; controls modernization; testing; commissioning; and staff training. All work must maintain continuous sewage system operation while complying with Federal, State, and Local regulations, NEC standards, NFPA 820, OSHA requirements, and Federal Bureau of Prisons security requirements.
The contract is awarded on a firm fixed-price basis. Progress payments are available at 80 percent of incurred costs, subject to a minimum request of $2,500 and a maximum of 80 percent of the total contract price. Wages are determined by Allegany County, Maryland prevailing-wage rates. Offerors must be registered in the System for Award Management (SAM) and must complete representations and certifications regarding small business status, debarment, tax compliance, covered telecommunications equipment, and other federal requirements.
The contracting officer is Brian Logsdon, reachable at 301-784-1000 or blogsdon@bop.gov. The contracting officer has authority to make changes within the contract scope and adjust pricing and schedules accordingly; the contractor must assert rights to adjustment within 30 days of receiving written change orders.
Opportunity text
237110 - Water and Sewer Line and Related Structures Construction. Work includes demolition and removal of existing pumps, grinder, auger, electrical disconnects, transfer switch, and controls; installation of new lift station equipment; electrical upgrades; controls modernization; testing; commissioning; and staff training. All work must maintain continuous sewage system operation and comply with Federal, State, Local, NEC, NFPA 820, OSHA, and FBOP security requirements.