RFQ Post Point Sludge Tank Replacement

Closed State & local contract opportunity Posted

Solicitation number
3B-2026
State
Washington
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Whatcom County is requesting quotes on construction of sludge storage tanks, odor control systems, pump replacement, and structural modifications at its wastewater treatment facility, with quotes due October 14, 2026.

The scope encompasses Area 440 sludge storage tanks with odor control system; new sludge, sump, RAS (return activated sludge), and WAS (waste activated sludge) pumps with associated piping, instruments, and equipment across Areas 420, 530, and 340; structural modifications to Area 420 building including new room separation and entrances; demolition of the existing Chlorine Building and selective demolition of structures, equipment, and piping in Areas 420 and 530 to accommodate new construction; excavation, shoring, dewatering, and pile installation for new construction in Area 440; secondary clarifier dewatering pump and discharge piping installation; temporary piping for RAS work; electrical equipment installation; HVAC improvements; repair and reconstruction of structures affected by the work; and commissioning of all installed systems.

The RFQ was posted September 10, 2026. No contract value, contract term, incumbent contractor, evaluation criteria, or additional procurement timeline milestones are identified in the source.

Opportunity text

Construction of Area 440 Sludge Storage Tanks and Odor Control System, and installation of new sludge pumps and sump pumps and associated equipment, instruments and piping in the existing Area 420 and 530. Structural modifications to existing building in Area 420 for new room separation and entrances. Demolition of existing Chlorine Building, demolition of portions of the structure, equipment and piping in Areas 420 and 530 to accommodate new equipment and structural features. Excavation, shoring, dewatering, and pile installation required for new construction in Area 440. Demolition and replacement of RAS pump discharge and header piping and two pumps, demolition and replacement of WAS pumps, installation of secondary clarifier dewatering pump and discharge piping, and temporary piping to accommodate the RAS work in Area 340. Work includes associated electrical equipment installation, heating, ventilation and air conditioning improvements, repair and reconstruction of existing structures affected by the Work, and incidentals for complete and usable facility, including commissioning of all installed work.