RFQ North Mills River Campground
Closed State & local contract opportunity Posted
- Solicitation number
- 12445226Q0042
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The National Forests in North Carolina, Pisgah Ranger District is requesting bids on reconstruction of the North Mills River Campground in Union County under a Total Small Business Set-Aside (NAICS 236220), with proposals due September 4, 2026. This procurement is restricted to small businesses.
The scope encompasses comprehensive disaster recovery reconstruction: Day Use Parking Area with new accessible concrete fishing landing; Day Use Picnic Area; all camping areas within the Roadside Loop and Main Loop with electrification of new sites; new 8-unit bathhouse within the Roadside Loop; potable water and sewer system improvements including a new lift station; electrical system upgrades and replacements; repairs to existing buildings; replacement of all signage; and replacement of two culverts. The project is structured in CSI format with detailed specifications across general requirements, site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, mechanical, and electrical divisions.
The period of performance is 270 calendar days from issuance of the Notice to Proceed. The contractor must maintain erosion and sediment control measures, comply with North Carolina Building Code and Uniform Plumbing Code, perform daily site cleaning, furnish a portable toilet, and operate within 6 a.m. to 6 p.m. Eastern Daylight Time Monday through Friday. All work must be executed to manufacturer specifications with comprehensive closeout including as-built drawings and operating manuals.
A mandatory pre-bid site visit is required. Detailed specifications and design quantities are provided in the attached construction document.
Opportunity text
Total Small Business Set-Aside, 236220 - Commercial and Institutional Building Construction. Reconstruction of the Day Use Parking Area including construction of a new accessible, concrete fishing landing area. Reconstruction of existing Day Use Picnic Area Reconstruction of all camping areas within the Roadside Loop, including electrification of new sites Construction of a new 8-unit bathhouse within the Roadside Loop Reconstruction of all camping areas within the Main Loop Improvements to the potable water and sewer system throughout the campground, including construction of a new lift station Electrical system upgrades and replacements throughout the recreation area Repairs to various existing buildings throughout the recreation area Replacement of all signs throughout the recreation area Replacement of two (2) culverts in the vicinity of the Campground, per the separate plans, schedule of items, and specifications.
Files
| File | Type | Posted |
|---|---|---|
| C04_Attachment_1_-_NMR_CG_Recon_Specifications.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity